System Design and Analysis
25.1309-1B · 2024-08-30 Source checked 2026-11-28
Scope, source and reading notes
Guidance for showing compliance with §25.1309. Confirm the applicable amendment level and accepted means for the programme.
Aerospace Consulting reference note: A starting point for transport-airplane system-safety assessment and development-assurance connections.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 90e625593d472b74ec69fbcefe97649f97794410dbe844f7684b397121ac5a92
7.5.3 Major Failure Conditions. Major failure conditions must be remote, per § 25.1309(b)(3).
7.5.3.1 If the system is similar in its relevant attributes to those used in other airplanes and the effects of failure would be the same, then design and installation appraisals (as described in Appendix B of this AC) and satisfactory service history of the equipment being analyzed, or of similar design, is usually acceptable for showing compliance. The applicant should substantiate similarity claims by identifying the differences between the system/equipment being certified and other system/equipment to which similarity is claimed. The applicant should also provide the rationale for why the service history of the other system/equipment is applicable.
7.5.3.2 For systems that are not complex, where similarity cannot be used as the basis for compliance, then compliance may be shown with a qualitative assessment showing that the system-level major failure conditions of the system, as installed, are consistent with the FHA and are remote (for example, redundant systems).
7.5.3.3 For complex systems without redundancy, compliance may be shown as in paragraph 7.5.3.2 above. To show that malfunctions are remote in systems of high complexity without redundancy (for example, a system with a self-monitoring microprocessor), it is sometimes necessary to conduct a qualitative functional FMEA supported by failure rate data and fault detection coverage analysis.
7.5.3.4 An analysis of a redundant system is usually complete if it shows isolation between redundant system channels and satisfactory reliability for each channel. For complex systems where functional redundancy is required, a qualitative FMEA and qualitative fault tree analysis may be necessary to determine whether redundancy actually exists (for example, no single failure affects all functional channels).
7.5.4 Hazardous and Catastrophic Failure Conditions. Hazardous failure conditions must be extremely remote, per § 25.1309(b)(2), and catastrophic failure conditions must be extremely improbable, per § 25.1309(b)(1).
7.5.4.1 Except as specified in paragraph 7.5.4.2 below, a detailed safety analysis is necessary for each hazardous and catastrophic failure condition identified by the FHA. The analysis is usually a combination of qualitative and quantitative assessment of the design.
7.5.4.2 For very simple and conventional installations—that is, low complexity and similarity in relevant attributes—it may be possible to assess a hazardous or catastrophic failure condition as extremely remote or
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Provides compliance guidance for
Source-backedEvidence and scope
FAA AC 25.1309-1B Cover and §1.1, printed p1-1 / PDF p6; FAA AC 25.1309-1B Appendix A §A.5, printed pA-3 / PDF p53
Provides acceptable means for compliance with 14 CFR 25.1309. Connects the rule change to amendment25-152 and notes harmonisation of failure-condition/probability terms with AMC 25.1309; this is not whole-document equivalence.
Assess against the applicable project amendment; current source and certification basis are distinct.
Supporting sourceReferences latest version
Source-backedEvidence and scope
FAA AC 25.1309-1B §1.4.5, printed pp1-7–1-8 / PDF pp12–13
Lists ARP4754 and ARP4761 without revision suffixes and explicitly instructs use of the latest referenced version. Preserve this revision policy rather than pinning the reference to legacy editions.
Do not display this as an explicit suffix-B citation; preserve family reference and latest-version instruction.
Supporting sourceReferences latest version
Source-backedEvidence and scope
FAA AC 25.1309-1B §1.4.5, printed pp1-7–1-8 / PDF pp12–13
Lists ARP4754 and ARP4761 without revision suffixes and explicitly instructs use of the latest referenced version. Preserve this revision policy rather than pinning the reference to legacy editions.
Do not display this as an explicit suffix-A citation; preserve family reference and latest-version instruction.
Supporting sourceReferences development-assurance guidance
Source-backedEvidence and scope
FAA AC 25.1309-1B §5.3.4, printed p5-4 / PDF p30
References AC 20-174 for aircraft/system assurance, AC 20-115D for software and AC 20-152A for hardware.
Read the cited document’s applicability and the project certification basis.
Supporting sourceRelated EASA safety guidance
Engineering contextEvidence and scope
FAA AC 25.1309-1B Appendix A §A.5, printed pA-3 / PDF p53
Connects the rule change to amendment25-152 and notes harmonisation of failure-condition/probability terms with AMC 25.1309; this is not whole-document equivalence.
Harmonised terms do not establish whole-document equivalence.
Supporting sourceReferences hardware guidance
Source-backedEvidence and scope
AC 25.1309-1B §5.3.4.2, printed p5-4 / PDF p30
Identifies AC 20-152A as hardware development-assurance guidance.
Read the source scope and applicable project basis.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
AC 23.1309-1E and AC 25.1309-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.