FAA Advisory circularActive — selected source checked

AC 25.1309-1B

System Design and Analysis

25.1309-1B · 2024-08-30 Source checked 2026-11-28

Scope, source and reading notes

Guidance for showing compliance with §25.1309. Confirm the applicable amendment level and accepted means for the programme.

Aerospace Consulting reference note: A starting point for transport-airplane system-safety assessment and development-assurance connections.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 90e625593d472b74ec69fbcefe97649f97794410dbe844f7684b397121ac5a92

Source page 47 · PDF page 47

7.7.1.4 The importance of multi-disciplinary teams in identifying and classifying failure conditions.

7.7.1.5 Effect of flightcrew and maintenance procedures in limiting the impact and propagation of failures. However, the effects of overreliance on flightcrew and maintenance actions are also a part of this consideration.

7.7.2 Rigorous and well-structured design and development procedures play an essential role in facilitating a methodical safety assessment process and providing visibility to the means of compliance. SAE ARP 4754 is recognized as the industry standard of practice for certification of highly integrated or complex airplane systems.

7.7.3 Experienced engineering and operational judgment should be applied when determining whether a system is complex. Comparison with similar, previously approved systems is sometimes helpful. All relevant systems attributes should be considered; however, the complexity of software and hardware do not need to be a dominant factor in determining complexity at the system level. The design of a system may be very complex, but predicting its potential malfunctions may be straightforward. For example, the software and interfaces of a predictive windshear system might be considered complex, but the potential failures of the system could be summarized as false alerts, misleading information, and the loss of ability to predict windshear.

7.8 Operational or Environmental Conditions.

7.8.1 A probability of 1 should usually be used for encountering a discrete condition for which the airplane is designed, such as instrument meteorological conditions or Category III weather operations, or landing distance field length provided in the AFM. However, appendix E of this AC contains allowable probabilities that may be assigned to various operational and environmental conditions for use in computing the average probability per flight hour of failure conditions without further justification. The FAA has provided appendix E for guidance and does not intend it to be exhaustive or prescriptive. Currently, a few items do not have accepted standard statistical data from which to derive a probability figure. However, these items are included either for future consideration, or as items for which the applicant may propose a probability figure supported by statistically valid data or supporting service experience. The applicant may propose additional conditions or different probabilities from those in appendix E of this AC, provided they are based on statistically valid data or supporting service experience. The applicant should provide justification for the data and obtain early agreement from the certification authority when such conditions will be included in an analysis. When combining the probability of such a random condition with that of a system failure(s), care should be taken to ensure that the condition and the system failure(s) are independent of one another, or that any dependencies are properly accounted for.

View figures, tables and original page layoutOriginal source page Source page 47 · PDF page 47 of AC 25.1309-1B

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

14 CFR 25.1309

Provides compliance guidance for

Source-backed
Evidence and scope

FAA AC 25.1309-1B Cover and §1.1, printed p1-1 / PDF p6; FAA AC 25.1309-1B Appendix A §A.5, printed pA-3 / PDF p53

Provides acceptable means for compliance with 14 CFR 25.1309. Connects the rule change to amendment25-152 and notes harmonisation of failure-condition/probability terms with AMC 25.1309; this is not whole-document equivalence.

Assess against the applicable project amendment; current source and certification basis are distinct.

Supporting source
ARP4754 document family

References latest version

Source-backed
Evidence and scope

FAA AC 25.1309-1B §1.4.5, printed pp1-7–1-8 / PDF pp12–13

Lists ARP4754 and ARP4761 without revision suffixes and explicitly instructs use of the latest referenced version. Preserve this revision policy rather than pinning the reference to legacy editions.

Do not display this as an explicit suffix-B citation; preserve family reference and latest-version instruction.

Supporting source
ARP4761 document family

References latest version

Source-backed
Evidence and scope

FAA AC 25.1309-1B §1.4.5, printed pp1-7–1-8 / PDF pp12–13

Lists ARP4754 and ARP4761 without revision suffixes and explicitly instructs use of the latest referenced version. Preserve this revision policy rather than pinning the reference to legacy editions.

Do not display this as an explicit suffix-A citation; preserve family reference and latest-version instruction.

Supporting source
AC 20-174

References development-assurance guidance

Source-backed
Evidence and scope

FAA AC 25.1309-1B §5.3.4, printed p5-4 / PDF p30

References AC 20-174 for aircraft/system assurance, AC 20-115D for software and AC 20-152A for hardware.

Read the cited document’s applicability and the project certification basis.

Supporting source
AMC 25.1309

Related EASA safety guidance

Engineering context
Evidence and scope

FAA AC 25.1309-1B Appendix A §A.5, printed pA-3 / PDF p53

Connects the rule change to amendment25-152 and notes harmonisation of failure-condition/probability terms with AMC 25.1309; this is not whole-document equivalence.

Harmonised terms do not establish whole-document equivalence.

Supporting source
AC 20-152A

References hardware guidance

Source-backed
Evidence and scope

AC 25.1309-1B §5.3.4.2, printed p5-4 / PDF p30

Identifies AC 20-152A as hardware development-assurance guidance.

Read the source scope and applicable project basis.

Supporting source
AC 23.1309-1E

Related technical context

Engineering context
Evidence and scope

AC 23.1309-1E and AC 25.1309-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.