AC 25.1309-1B
System Design and Analysis
25.1309-1B · 2024-08-30 Source checked 2026-11-28
Scope, source and reading notes
Guidance for showing compliance with §25.1309. Confirm the applicable amendment level and accepted means for the programme.
Aerospace Consulting reference note: A starting point for transport-airplane system-safety assessment and development-assurance connections.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 90e625593d472b74ec69fbcefe97649f97794410dbe844f7684b397121ac5a92
7.6.2 The details of how to calculate the average probability per flight hour for a failure condition are given in appendix F of this AC and in SAE ARP 4761.
7.6.3 If the probability of a subject failure condition occurring during a typical flight of mean duration for the airplane type divided by the flight’s mean duration in hours is likely to be significantly different from the predicted average rate of occurrence of that failure condition during the entire operational life of all airplanes of that type, then a better model of the flight of average risk must be used. For example, the loss of consumable material (for example, fluid leakage) may become a critical failure condition for a flight that is longer than the flight of mean duration.
7.6.4 For various reasons, component failure rate data are not typically precise enough to enable accurate estimates of the probabilities of failure conditions. This results in some degree of uncertainty, as indicated by the wide line in figure 4-1 of this AC, and the expression “on the order of” in the descriptions of the quantitative probability terms that are provided above. (See paragraph 3.3 of this AC.) When calculating the estimated probability of each failure condition, this uncertainty should be accounted for in a conservative way that does not compromise safety.
7.7 Integrated Systems.
7.7.1 Both physical and functional interconnections between systems have been a feature of airplane design for many years. Section 25.1309(b) accounts for this in requiring systems to be considered in relation to other systems. Provided the interfaces between systems are relatively few and simple, and hence readily understandable, compliance may often be shown through a series of system safety assessments (SSA). Each SSA deals with a particular failure condition (or more likely a group of failure conditions) associated with a system and, where necessary, accounts for failures arising at the interface with other systems. However, where the systems and their interfaces become more complex and extensive, the task of showing compliance may become more complex. It is therefore essential that the means of compliance are considered early in the design phase to ensure that the design can be supported by a viable safety assessment strategy. Aspects of the guidance material that should be given particular consideration are as follows:
7.7.1.1 Planning the proposed means of compliance. This should include development assurance activities to mitigate the occurrence and effects of errors in the design.
7.7.1.2 Considering the importance of architectural design in limiting the impact and propagation of failures.
7.7.1.3 The potential for common cause failures and cascading failure effects and the possible need to assess combinations of multiple lower level failure conditions. (For example, multiple minor and/or major failure conditions can lead up to a hazardous or catastrophic failure condition).
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Provides compliance guidance for
Source-backedEvidence and scope
FAA AC 25.1309-1B Cover and §1.1, printed p1-1 / PDF p6; FAA AC 25.1309-1B Appendix A §A.5, printed pA-3 / PDF p53
Provides acceptable means for compliance with 14 CFR 25.1309. Connects the rule change to amendment25-152 and notes harmonisation of failure-condition/probability terms with AMC 25.1309; this is not whole-document equivalence.
Assess against the applicable project amendment; current source and certification basis are distinct.
Supporting sourceReferences latest version
Source-backedEvidence and scope
FAA AC 25.1309-1B §1.4.5, printed pp1-7–1-8 / PDF pp12–13
Lists ARP4754 and ARP4761 without revision suffixes and explicitly instructs use of the latest referenced version. Preserve this revision policy rather than pinning the reference to legacy editions.
Do not display this as an explicit suffix-B citation; preserve family reference and latest-version instruction.
Supporting sourceReferences latest version
Source-backedEvidence and scope
FAA AC 25.1309-1B §1.4.5, printed pp1-7–1-8 / PDF pp12–13
Lists ARP4754 and ARP4761 without revision suffixes and explicitly instructs use of the latest referenced version. Preserve this revision policy rather than pinning the reference to legacy editions.
Do not display this as an explicit suffix-A citation; preserve family reference and latest-version instruction.
Supporting sourceReferences development-assurance guidance
Source-backedEvidence and scope
FAA AC 25.1309-1B §5.3.4, printed p5-4 / PDF p30
References AC 20-174 for aircraft/system assurance, AC 20-115D for software and AC 20-152A for hardware.
Read the cited document’s applicability and the project certification basis.
Supporting sourceRelated EASA safety guidance
Engineering contextEvidence and scope
FAA AC 25.1309-1B Appendix A §A.5, printed pA-3 / PDF p53
Connects the rule change to amendment25-152 and notes harmonisation of failure-condition/probability terms with AMC 25.1309; this is not whole-document equivalence.
Harmonised terms do not establish whole-document equivalence.
Supporting sourceReferences hardware guidance
Source-backedEvidence and scope
AC 25.1309-1B §5.3.4.2, printed p5-4 / PDF p30
Identifies AC 20-152A as hardware development-assurance guidance.
Read the source scope and applicable project basis.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
AC 23.1309-1E and AC 25.1309-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source