AC 25.1309-1B
System Design and Analysis
25.1309-1B · 2024-08-30 Source checked 2026-11-28
Scope, source and reading notes
Guidance for showing compliance with §25.1309. Confirm the applicable amendment level and accepted means for the programme.
Aerospace Consulting reference note: A starting point for transport-airplane system-safety assessment and development-assurance connections.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 90e625593d472b74ec69fbcefe97649f97794410dbe844f7684b397121ac5a92
AC 25.1309-1B Appendix F
F.3 Calculating the Probability of a Failure Condition for a Certain Average Flight. The probability of a failure condition occurring on an average flight Pflight(failure condition in a flight) should be determined by structured methods (see SAE ARP 4761 for example methods) and should consider all significant elements (e.g., combinations of failures and events) that contribute to the failure condition. The following should be considered:
F.3.1 The component failure rates used to calculate the “average probability per flight hour” should be estimates of the mature constant failure rates after infant mortality and prior to wear out. For components whose probability of failure may be associated with non-constant failure rates within the operational life of the airplane, reliability analysis may be used to determine component replacement times. In either case, the failure rate should be based on all causes of failure (operational, environmental, and so forth). The failure rate is for the type design hardware that is operated and maintained through servicing plans or ICA requirements. Where available, service history of same or similar components in the same or similar environment should be used.
F.3.1.1 Aging and wear of similarly constructed and similarly loaded redundant components that could directly, or when in combination with one other failure, lead to a catastrophic or hazardous failure condition should be assessed when determining scheduled maintenance tasks for such components.
F.3.1.2 Replacement times—necessary to mitigate the risk due to aging and wear of those components whose failures could directly, or in combination with one other failure, lead to a catastrophic or hazardous failure condition within the operational life of the airplane—should be assessed through the same methodology as other scheduled maintenance tasks required to satisfy § 25.1309 (for example, AC 25-19A) and documented in the ALS as appropriate.
F.3.2 If one failed element in the system can persist for multiple flights (latent, dormant, or hidden failures), the calculation should consider the relevant exposure times (for example, time intervals between maintenance and operational checks/inspections). In such cases, the total probability of the failure condition increases with the number of flights during the latency period.
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Provides compliance guidance for
Source-backedEvidence and scope
FAA AC 25.1309-1B Cover and §1.1, printed p1-1 / PDF p6; FAA AC 25.1309-1B Appendix A §A.5, printed pA-3 / PDF p53
Provides acceptable means for compliance with 14 CFR 25.1309. Connects the rule change to amendment25-152 and notes harmonisation of failure-condition/probability terms with AMC 25.1309; this is not whole-document equivalence.
Assess against the applicable project amendment; current source and certification basis are distinct.
Supporting sourceReferences latest version
Source-backedEvidence and scope
FAA AC 25.1309-1B §1.4.5, printed pp1-7–1-8 / PDF pp12–13
Lists ARP4754 and ARP4761 without revision suffixes and explicitly instructs use of the latest referenced version. Preserve this revision policy rather than pinning the reference to legacy editions.
Do not display this as an explicit suffix-B citation; preserve family reference and latest-version instruction.
Supporting sourceReferences latest version
Source-backedEvidence and scope
FAA AC 25.1309-1B §1.4.5, printed pp1-7–1-8 / PDF pp12–13
Lists ARP4754 and ARP4761 without revision suffixes and explicitly instructs use of the latest referenced version. Preserve this revision policy rather than pinning the reference to legacy editions.
Do not display this as an explicit suffix-A citation; preserve family reference and latest-version instruction.
Supporting sourceReferences development-assurance guidance
Source-backedEvidence and scope
FAA AC 25.1309-1B §5.3.4, printed p5-4 / PDF p30
References AC 20-174 for aircraft/system assurance, AC 20-115D for software and AC 20-152A for hardware.
Read the cited document’s applicability and the project certification basis.
Supporting sourceRelated EASA safety guidance
Engineering contextEvidence and scope
FAA AC 25.1309-1B Appendix A §A.5, printed pA-3 / PDF p53
Connects the rule change to amendment25-152 and notes harmonisation of failure-condition/probability terms with AMC 25.1309; this is not whole-document equivalence.
Harmonised terms do not establish whole-document equivalence.
Supporting sourceReferences hardware guidance
Source-backedEvidence and scope
AC 25.1309-1B §5.3.4.2, printed p5-4 / PDF p30
Identifies AC 20-152A as hardware development-assurance guidance.
Read the source scope and applicable project basis.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
AC 23.1309-1E and AC 25.1309-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source