AC 25.1309-1B
System Design and Analysis
25.1309-1B · 2024-08-30 Source checked 2026-11-28
Scope, source and reading notes
Guidance for showing compliance with §25.1309. Confirm the applicable amendment level and accepted means for the programme.
Aerospace Consulting reference note: A starting point for transport-airplane system-safety assessment and development-assurance connections.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 90e625593d472b74ec69fbcefe97649f97794410dbe844f7684b397121ac5a92
satisfying the objectives of this AC. However, these documents contain material and methods that an applicant may choose to use for performing the safety assessment. The FAA recognizes these methods, when correctly applied, as valid for showing compliance with § 25.1309(b). In addition, SAE ARP 4761 contains tutorial information on applying specific engineering methods (for example, Markov analysis and fault tree analysis) that an applicant may wish to use in whole or in part.
5.3.4 Acceptable Application of Development Assurance Methods.
5.3.4.1 Paragraph 5.3.1.3 of this AC states that any analysis necessary to show compliance with § 25.1309(b) should consider the possibility of errors in requirement, design, and implementation. Errors made during the design and development of systems have traditionally been detected and corrected by exhaustive tests conducted on the system and its components, by direct inspection, and by other direct verification methods capable of completely characterizing the performance of the system. These direct techniques may still be appropriate for simple systems, which perform a limited number of functions and are not highly integrated with other airplane systems.
5.3.4.2 For integrated systems, or systems that perform complex functions, exhaustive testing might be either impossible because all of the system states (within a particular system and within the interfacing systems) cannot be determined, or impractical because of the number of tests that must be accomplished. For these types of systems, the applicant may use development assurance techniques to minimize errors. The rigor of development assurance should be determined by the severity of potential effects on the airplane in case of system malfunctions or loss of functions. Acceptable guidelines for development assurance are described in—
• AC 20-174, which recognizes SAE ARP 4754 for aircraft and systems,
• AC 20-115D, which addresses the software aspects of certification, including the use of RTCA Document DO-178, supplements to DO- 178, and tool qualification, and
• AC 20-152A, which addresses airborne electronic hardware aspects of certification, including the use of RTCA Document DO-254.
5.3.4.3 Development assurance activities should define and identify all requirements, including any derived safety requirements needed to manage the many interactions between the systems. The activities should also validate that these requirements are complete and correct and verify that the system design meets those requirements. The development assurance activities should verify that the design provides for fault containment, so that the integrated systems are shown to be fail-safe.
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Provides compliance guidance for
Source-backedEvidence and scope
FAA AC 25.1309-1B Cover and §1.1, printed p1-1 / PDF p6; FAA AC 25.1309-1B Appendix A §A.5, printed pA-3 / PDF p53
Provides acceptable means for compliance with 14 CFR 25.1309. Connects the rule change to amendment25-152 and notes harmonisation of failure-condition/probability terms with AMC 25.1309; this is not whole-document equivalence.
Assess against the applicable project amendment; current source and certification basis are distinct.
Supporting sourceReferences latest version
Source-backedEvidence and scope
FAA AC 25.1309-1B §1.4.5, printed pp1-7–1-8 / PDF pp12–13
Lists ARP4754 and ARP4761 without revision suffixes and explicitly instructs use of the latest referenced version. Preserve this revision policy rather than pinning the reference to legacy editions.
Do not display this as an explicit suffix-B citation; preserve family reference and latest-version instruction.
Supporting sourceReferences latest version
Source-backedEvidence and scope
FAA AC 25.1309-1B §1.4.5, printed pp1-7–1-8 / PDF pp12–13
Lists ARP4754 and ARP4761 without revision suffixes and explicitly instructs use of the latest referenced version. Preserve this revision policy rather than pinning the reference to legacy editions.
Do not display this as an explicit suffix-A citation; preserve family reference and latest-version instruction.
Supporting sourceReferences development-assurance guidance
Source-backedEvidence and scope
FAA AC 25.1309-1B §5.3.4, printed p5-4 / PDF p30
References AC 20-174 for aircraft/system assurance, AC 20-115D for software and AC 20-152A for hardware.
Read the cited document’s applicability and the project certification basis.
Supporting sourceRelated EASA safety guidance
Engineering contextEvidence and scope
FAA AC 25.1309-1B Appendix A §A.5, printed pA-3 / PDF p53
Connects the rule change to amendment25-152 and notes harmonisation of failure-condition/probability terms with AMC 25.1309; this is not whole-document equivalence.
Harmonised terms do not establish whole-document equivalence.
Supporting sourceReferences hardware guidance
Source-backedEvidence and scope
AC 25.1309-1B §5.3.4.2, printed p5-4 / PDF p30
Identifies AC 20-152A as hardware development-assurance guidance.
Read the source scope and applicable project basis.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
AC 23.1309-1E and AC 25.1309-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source