EASA Means of ComplianceFinal — current published edition checked

MOC-5 SC-VTOL

Means of Compliance with SC-VTOL — Batch 5

Issue 2 — FINAL Source checked 2026-11-28

Scope, source and reading notes

Complete final batch 5 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.

Aerospace Consulting reference note: Fifth final batch, introducing additional means of compliance and amendments to earlier MoC batches. This is the final Issue 2, not the consultation draft or tracked copy.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 5e91110d91378ed3836aafe2cb30871f5b2d3802a92b97a28acf42913467a949

Source page 18 · PDF page 18

Doc. No: MOC-5 SC-VTOL Issue: 2 Date: 5 November 2026

Special Condition VTOL

of EASA attendance or not to HF or HQ evaluations, this data is expected to be directly visible in the certification data package, for example data could be included in the evaluations test reports. (10) The Applicant should describe the strategy in use to select which requirements are to be tested in the simulation bench and/or test rig and which in the real platform/equipment. This strategy should explain, as a minimum:

(i) The rationale as to why the simulation bench / test rig is more suitable for a given test. (ii) The justification on the adequacy of the bench to carry out that test. (iii) That if a requirement cannot be 100% covered by the simulation bench or test rig

environment:

(A) identification of which parts of the requirement can be tested in the simulation

bench or test rig is expected; (B) identification of which parts of the requirement cannot be tested in the simulation

bench or test rig, why they cannot be tested in that environment and which validation and/or verification will be done instead is expected.

(11) To ensure representativeness, a selection of tests should be run in the simulated platform (simulation bench and/or test rig) and in real platform for comparison:

(i) In order to demonstrate the representativeness of the simulation bench and test rigs,

the applicant should perform a sub-set of the tests in both environments: ion the simulation bench and/or test rig and also in the real platform/equipment, and compare the results. (ii) The outcome of this comparison should be documented. (iii) An analysis of the results should be performed to ensure that the planned tests are still

in scope of the representativeness of the simulation bench and test rigs. (iv) This sub-set of tests should include a large enough sample of test cases to cover the full

functionality. (v) For simulation benches, this process should include a comparison of the simulation

bench’s handling qualities and performance with the real aircraft.

(e) Recognition of the simulation bench and test rig in the design organisation manual (or equivalent) as a

certification means:

If the simulation bench/test rig is planned to be used to generate compliance data (this applies for instance if some certification tests are planned to be performed on the simulation benches or test rigs):

For any test facility used to produce deliverables (e.g. certification reports), the personnel and the processes should be managed via procedures under the control of the Design Organization. The simulation bench/test rig should be recognized as an asset of the applicant Design Organization. The applicant should document:

(i) how the simulation bench/test rig is recognized in the Design Organisation Manual (or

equivalent) as a certification means; (ii) which processes of the Design Organization are in place that are related to the aspects

and considerations discussed in this MOC.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

SC-VTOL-02

Related technical context

Engineering context
Evidence and scope

SC-VTOL-02 and MOC-5 SC-VTOL — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.