Scope, source and reading notes

Complete final batch 5 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.

Aerospace Consulting reference note: Fifth final batch, introducing additional means of compliance and amendments to earlier MoC batches. This is the final Issue 2, not the consultation draft or tracked copy.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 5e91110d91378ed3836aafe2cb30871f5b2d3802a92b97a28acf42913467a949

Source page 14 · PDF page 14

Doc. No: MOC-5 SC-VTOL Issue: 2 Date: 5 November 2026

Special Condition VTOL

In order to ensure that proper results are obtained, simulation benches and test rigs must be adequately representative of aircraft systems and flight dynamics. At the same time, the limitations for using simulation benches and test rigs must be established. This objective can be achieved by a combination of a controlled development process and configuration management of simulation benches and test rigs, system models behaviour validation (crosschecked when necessary, with partial system development bench or flight test results, analysis, desktop simulation) and engineering/operational judgment.

In line with requirement 21.A.33 from Regulation (EU) No 748/2012, for tests to be used for demonstration of compliance with the type certification basis, the applicant shall issue a statement of conformity listing any potential non-conformity, together with a justification that this will not affect the test results, and shall allow EASA to make any inspection it considers necessary to check the validity of that statement.

Means of Compliance

To consider using simulation benches and test rigs as means of compliance and for validation & verification activities for System Development Assurance, the following aspects should be addressed by the applicant:

(a) Identify/list all simulation benches and test rigs proposed in the Certification Programme to be used for

“simulation” and “laboratory test” compliance demonstrations (as per Appendix A to AMC 21.A.15(b)), or for validation & verification activities for System Development Assurance. (b) Controlled development process:

Simulation benches and test rigs usually integrate numerous real aircraft systems or components, and modelled systems or components. Although simulation benches and test rigs are not subject to certification, the design of such devices for use as a certification means is deemed of sufficient complexity to stipulate a formalized and structured development process.

The applicant should provide to EASA the development process for the simulation bench and test rig to achieve the applicant own objectives for the scope and intended use. This development process should include the usage of problem reports to record identified issues and their associated corrections. When simulation benches and test rigs are re-used from another project, the applicant should propose justifications to ensure the correctness/appropriateness of the rigs for the intended purpose. This development process should ensure that relevant specifications (e.g. ICD (Interface Control Document) data, model representativeness requirements, etc.) are shared with model suppliers.

(c) Configuration management:

Simulation benches and test rigs configuration should be managed similarly to the test aircraft configuration with a traceability that covers all relevant systems and models as well as the human machine interface (HMI). A change control process should also be implemented. (2) A detailed status of simulation benches and test rigs configuration should be established for all certification tests (including tests performed without EASA participation) and briefed along with each test order before the certification tests:

(i) The configuration management of simulation benches and test rigs should include the

relevant elements for the test objectives (e.g. version of the flight control

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

SC-VTOL-02

Related technical context

Engineering context
Evidence and scope

SC-VTOL-02 and MOC-5 SC-VTOL — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.