AC 29-2C
Certification of Transport Category Rotorcraft
29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28
Scope, source and reading notes
Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.
Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013
vi. MOC for Objective 8: A well designed disconnection system will function during the tests required by the MOC for Objectives 1, 2 and 7 except for the test in RTCA Document DO-347, section 2.3.9, where the protection is already disabled. This is one of the means of preventing the Failure Conditions discussed in the Evaluation Criteria sections of RTCA Document DO-347 for these tests. Confirm the battery automatically disconnects from its discharging circuit during these tests.
vii. MOC for Objective 9: Objective 9 specifies flight crew alerting if the failure of a battery installation, in itself or in relation to a system that performs an aircraft-level function, could result in “unsafe system operating conditions.” The alert should comply with the applicable color requirement in § 29.1322. The applicant should refer to Section AC 29.1322 for an acceptable method of compliance.
viii. MOC for Objective 10: The following are examples of “means” for flight crew or maintenance personnel to determine the battery charge state:
(a) A manually activated system (e.g., push button) that displays the available charge of each battery unit.
(b) An automatic system that records the available charge of each battery unit on an appropriate interval and makes it available to maintenance personnel before the next flight.
(c) Physical access that allows a maintenance person to measure the battery charge state.
3. The MOCs for Objectives 1 through 10 are only acceptable for required functions if ICAs include a check of the battery charge state within an interval that will ensure sufficient charge for each flight considering the worst-case scenario and replacement of the battery when the charge is not sufficient.
4. MOC for Very Small Non-Rechargeable Lithium Batteries: An acceptable MOC for Objectives 1 through 8 for non-rechargeable lithium battery installations that have less than 2 watt-hours of energy is showing these batteries meet Underwriters Laboratories (UL) 1642 or UL 2054.
(ix) Part 29 Compliance. Non-rechargeable lithium battery installations should satisfy each of the MOCs identified in this guidance to comply with all applicable part 29 requirements. The following provides means of compliance and other information on some part 29 requirements:
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source