AC 29-2C
Certification of Transport Category Rotorcraft
29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28
Scope, source and reading notes
Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.
Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013
(5) Energy storage systems that have the potential to emit corrosive fluids, explosive gasses, or toxic gasses will require a design scheme to contain, drain, or vent these fluids or gasses, to meet the requirements of § 29.1353(c). This design scheme must not expose structure or adjacent equipment to corrosive fluids, as required by § 29.1353(c), or allow explosive or toxic gasses to accumulate to hazardous levels, as required by § 29.1353(b).
(6) Energy storage systems that are susceptible to thermal runaway should include a sense and control capability to prevent such an event or a design to safely contain or vent heat and pressure. Designs for energy storage systems with potential for thermal runaway must prevent an uncontrolled cascading failure that results in a hazardous condition, to meet the requirements of § 29.1353(d).
b. Procedures.
(1) General. Chapter 11 of Advisory Circular 43.13-1B, Acceptable Methods, Techniques, and Practices—Aircraft Inspection and Repair, includes considerable guidance regarding the installation of electrical systems (routing, separation, typing, clamping, j-box installations, etc.). The following areas are overlooked in many cases, and special emphasis should be placed on them during the compliance inspection of the rotorcraft:
(i) Feeder wires from the rotorcraft’s generators and energy storage systems should be routed separately from utilization system wiring.
(ii) Generator field wiring should be routed separately from generator output wiring. This should begin at the generator and continue to the voltage regulator.
(2) Energy Storage System Installation.
(i) Installation approval of an energy storage system consists of two parts. One part is the approval of the energy storage system performance specifications that meet the rotorcraft requirements and the other part is the actual installation of the energy storage system into the rotorcraft. The following methods of showing compliance can be demonstrated by a combination of tests and analysis.
(ii) Approval of the energy storage system for installation is dependent on rotorcraft requirements for the installed equipment and operations.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source