Scope, source and reading notes
Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.
Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013
(4) Safety Assessment Process Overview.
(i) When showing compliance with § 29.1309, the considerations covered in this guidance should be addressed in a methodical and systematic manner. This section of the AC (Safety Assessment Process Overview) is provided primarily for the use of applicants who are not familiar with the various methods and procedures generally used in the industry to conduct safety assessments. This section and Figures AC 29.1309-4 and AC 29.1309-5 are not intended to be certification checklists, and they do not include all the information provided in this guidance. This section contains one method, but not the only method, for showing compliance. The safety assessment process is a structured method of general applicability for showing compliance with the regulation. Other methodologies may be used to show compliance, but the safety assessment process is the only structured process that is defined and these defined objectives would be the logical criteria applied to any other means of showing compliance. More detailed guidance can be found in SAE ARP 4761 on how to perform a safety assessment. SAE ARP 4754A, discussed AC 20-174, includes additional information on how the safety assessment process relates to the system development process.
(ii) The safety assessment process contains several parts that may be necessary as a whole or in part, depending on the criticality or complexity of the system under consideration. The rigor of assessment and analysis performed is also dependent on the system criticality or complexity. At the extremes, some systems may be simple enough such that the entire safety assessment can be performed by observation and compliance shown by a simple statement. Complex and higher criticality systems may require application of all of the safety assessment elements to show compliance. Many states of varying complexity exist between these extremes that may use less than the entire safety assessment process but require more than a simple statement to show compliance. For purposes of the FHA, an autorotation is not considered continued safe flight and landing.
(iii) Typical elements of the safety assessment process are as follows:
Functional Hazard Assessment (FHA) Preliminary System Safety Assessment (PSSA)
o Fault Tree Analysis (FTA) System Safety Assessment (SSA)
o Failure Mode and Effect Analysis (FMEA) Common Cause Analysis (CCA)
o Zonal Safety Analysis (ZSA) o Particular Risk Assessment (PRA) o Common Cause Analysis (CMA)
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.