AC 29-2C
Certification of Transport Category Rotorcraft
29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28
Scope, source and reading notes
Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.
Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013
The applicant’s description and justification of the SPI display should address the following:
(1) The accuracy of the engine power and other engine indications to safely conduct Category B and, when applicable, Category A operations (power setting, NR control, piloting a given rating with precision).
(2) The flight crew must be able to assess how close the indicated parameter is relative to the limit, including the transitions from one limiting factor to another (engine manifold pressure to engine RPM or engine torque to gas temperature indicator to engine compressor speed), and the ability to quickly and accurately compare engine-to engine data when engine limiting factors are different (Engine 1 Torque, Engine 2 Gas Temperature Indicator). See §§ 29.1321 and 29.1549.
(3) Engine design features or characteristics that forewarn the crew prior to the parameter reaching the operating limit (the redline) should be evaluated.
(4) The SPI display must provide a timing countdown when operating with time limited power settings and as required by § 29.1305(a)(25).
(5) The minimum and maximum operating limits must be marked as required by § 29.1549.
(6) The SPI display should allow the pilot to identify indicator failures, engine failures, partial power loss conditions, and adverse trends, to meet the requirements in §§ 29.771(a), 29.1309, 29.1321, and 29.1549. The SPI design should also address all normal and abnormal operations including start/shutdown and OEI conditions per § 29.771(a).
(7) Since the SPI is a system comprised of instruments requirement by subchapter C of Title 14, its hazards are among those that must assessed under the requirements of § 29.1309. When conducting this assessment, to meet the requirements in § 29.1301, the applicant must take into account that the crew will operate the rotorcraft, monitoring the engine status and health, without continuously accessing the powerplant display page. In addition, the assessment should assume the SPI will remain the only engine instrument available in case of loss of one display.
For guidance on § 29.1305(b)(4) OEI training mode, see Miscellaneous Guidance 22 (MG 22).
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source