AC 29-2C
Certification of Transport Category Rotorcraft
29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28
Scope, source and reading notes
Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.
Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013
(6) Installation of long line provided with electrical wiring to control the hook will generally represent a new electromagnetic coupling path from external area to the internal systems that may not have been considered for type certification. As such, the impact of this installation on the coupling to helicopter systems, due to direct connection or cross talk to wirings, shall be addressed in accordance with § 29.1317, 29.1316 and 29.610 as a minimum.
(9) Cable
(i) Cable attachment. Either the cable should be positively attached to the hoist drum and the attachment should have ultimate load capability or equivalent means should be provided to minimize the possibility of inadvertent, complete cable unspooling.
(ii) Cable length and marking. A length of cable nearest the cable's attachment to the hoist drum should be visually marked to indicate to the operator that the cable is near full extension. The length of cable to be marked is a function of the maximum extension speed of the system and the operator's reaction time needed to prevent cable run out. It should be determined during certification demonstration tests. In no case should the length be less than 3-1/2 drum circumferences.
(iii) Cable stops. Means should be present to automatically stop cable movement quickly when the system's extension and retraction operational limits are reached.
(10) Section 29.865(c)(2) PCDS. For all HEC applications, an approved PCDS is required. The PCDS may be either previously approved or is required to be approved during certification. A PCDS may also be approved after the external load system certification. Including a limitation in the RFM or RFMS requiring an approved PCDS will permit more flexibility for operators to utilize their own approved PCDS (see paragraph d.(4) of this guidance). In either case, its compatibility with the helicopter should be approved.
Note: PCDS designs can vary from simple single occupant lifesaving devices to relatively complex multiple occupant cages or gondolas. The purpose of the PCDS is to provide a minimum acceptable level of safety for personnel being transported outside the rotorcraft. The personnel being transported may be healthy or injured, conscious or unconscious.
(i) TSO C167 is an approved minimum performance specification for HEC body harnesses.
(ii) Static strength. The PCDS should be substantiated for the allowable ultimate load and loading conditions as determined under paragraph d.(6) above.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source