AC 29-2C
Certification of Transport Category Rotorcraft
29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28
Scope, source and reading notes
Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.
Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013
effect of the cable acting as a spring between the rotorcraft and the suspended external load.
(A) Determine the basic loads that result in the failure or unspooling of the hoist or its installation, respectively.
Note: This determination should be based on static strength and any significant dynamic load magnification factors.
(B) Select the lower of the two values as the ultimate load of the hoist system installation.
(C) Divide the selected ultimate load by 1.5 to determine the true structural limit load of the system.
(D) Determine the manufacturer's approved (or applicants applied for) "limit design safety factor." Divide this factor into the true structural limit load (from (C) above) to determine the hoist system's working (or placarded) limit load.
(E) Compare the system's derived limit load to the applied one "g" payload multiplied by the maximum downward vertical load factor (NZWMAX) to determine the critical payload's limit value.
(F) The critical limit payload should be equal to or less than the system's derived limit load for the installation to be approvable.
(vi) Fatigue Substantiation Procedures
(A) Fatigue evaluation of NHEC applications. Any critical components of the suspended system and their attachments (e.g., the cargo hook, or bolted or pinned truss attachments), the failure of which could result in a hazard to the rotorcraft, should include an acceptable fatigue analysis.
(B) Fatigue evaluation of HEC applications. The entire external load system, including the PCDS, should be reviewed on a component-by-component basis to determine which, if any, components are fatigue critical. These components should be analyzed or tested to assure their fatigue life limits are properly determined and placed in the limited life section of the maintenance manual.
(7) Section 29.865(b) and § 29.865(c) Procedures for Quick Release Systems. For jettisonable RLCs of any applicable cargo type, both a primary quick-release system (PQRS) and a back-up quick-release system (BQRS) are required. Features that should be considered are:
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source