AC 29-2C
Certification of Transport Category Rotorcraft
29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28
Scope, source and reading notes
Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.
Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013
Figure No. Title Page No.
AC 29.1419-2 Intermittent Icing-Temperature vs. Altitude Limits. ..................F-111
AC 29.1419-3 Continuous Icing-Liquid Water Content vs Drop Diameter......F-112 AC 29.1419-4 Intermittent Icing-Liquid Water Content vs Drop Diameter. .....F-113
AC 29.MG 3-1 Category II Approach Evaluation.............................................MG 3-5
AC 29.MG 3-2 Category II Approach Evaluation. (cont.) ................................MG 3-6
AC 29.MG 5-1 Acceptable Ultimate Load Factor for Agricultural ....................MG 5-3
Dispensing Equipment Design.
AC 29.MG 5-2 Sketch of Tank Pressure Test.................................................MG 5-7
AC 29.MG 6-1 Typical Liquid Oxygen System................................................MG 6-22
AC 29.MG 6-2 Typical Liquid Oxygen System - Using Combination Valve.....MG 6-23
AC 29 MG 8-1 Schematic Diagram of Building Block Tests............................MG 8-16
AC 29 MG 8-2 Characterization of Impact Damage........................................MG 8-20
AC 29 MG 8-3 Residual Strength vs. Time. ....................................................MG 8-23
AC 29 MG 8-4 Residual Strength and Damage Size Relationships for...........MG 8-24
Fail-Safe Substantiation.
AC 29 MG 9-1 Installed Engine Fuel Flow Capacity Check ............................MG 9-8
AC 29 MG 11-1 Crack Growth for Single Element Structure ............................MG 11-14
AC 29 MG 11-2 Crack Growth for Remaining Elements of Multiple..................MG 11-16 Element Structure.
AC 29 MG 11-3 No Crack Growth Scenario. ....................................................MG 11-18
AC 29 MG 11-4 Slow Crack Growth Scenario. .................................................MG 11-18
AC 29 MG 11-5 Detectable Crack Growth Scenario.........................................MG 11-19
AC 29 MG 14-1 Refrigeration Cycle..................................................................MG 14-7
AC 29 MG 15-1 Flow Chart for Use of Mitigating Actions Applied for ...............MG 15-8
Reduction of Software Level.
AC 29 MG 15-2 Flow Chart for Application of HUMS Specific Software...........MG 15-11
with a Ground Base that uses COTS Software for Operational Software
AC 29 MG 17-1 Verification Methodology.........................................................MG 17-4
AC 29 MG 19-1 Primary Field of View ..............................................................MG 19-15
AC 29 MG 19-2 Secondary Field of View .........................................................MG 29-16
AC 29 MG 20-1 Primary and Secondary Horizontal Fields of View ..................MG 20-18
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source