Scope, source and reading notes

Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.

Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013

Source page 329 · PDF page 329

critical load path inoperative and appropriate flaws imposed on the remainder of the structure, as determined by the threat assessment.

(B) The method described in paragraph f.(8)(i) can be employed for this case with the following differences:

(1) The principal “flaw” considered is failure or loss of the most critical load path. The load path failure can be the result of fatigue cracking, static failure, or a fractured or missing fastener, as determined by the threat assessment, paragraph f.(5).

(2) The remainder of the structure may be representative of normal manufacturing quality unless the threat assessment indicates that larger damage should exist.

(3) The mean strength for the substantiation should be based on the number of cycles from the first load path failure to the first initiation of cracking at any other point in the remaining structure. Any applied load changes or load distribution changes that occur as a consequence of the load path failure should also be included (bending due to increased deflection, for example).

(4) When the remaining structure may have some pre-existing fatigue damage at the time the first load path fails (due to both load paths being highly loaded, for example), this should be factored into the analysis.

(5) The remaining structure after first load path failure must be shown to have limit load capability, considered as the ultimate loading, except in some cases where no retirement life is provided and fatigue damage is expected (see paragraph f.(10).

(6) The inspection conducted is for the failed or missing load path.

(9) Retirement Time and Inspection Interval Schedules.

(i) Based on the evaluations required by § 29.571, inspections, retirement times, combinations thereof, or other procedures have been established as necessary to avoid catastrophic failure. These inspections, retirement times, or approved equivalent means must be included in the Airworthiness Limitations Section (ALS) of the Instructions for Continued Airworthiness (ICA) as required by § 29.1529 and Appendix A29.4 of the regulatory requirements. These inspections, retirement times, or a combination of both are normally stated in hours time-in-service, but may be stated in other terms, such as engine starts, landings, external lifts, etc.

(ii) The design service life should be specified in the fatigue evaluation methodology that must be approved by the FAA. In any case, routine inspections for wear, fretting, corrosion, cracking, and service damage are appropriate. These routine inspections should be noted in the ICAs (maintenance manual) but are not required to

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 27-1B

Related technical context

Engineering context
Evidence and scope

AC 27-1B and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source
CS-29

Related technical context

Engineering context
Evidence and scope

CS-29 and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.