FAA Advisory circularActive

AC 29-2C

Certification of Transport Category Rotorcraft

29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28

Scope, source and reading notes

Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.

Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013

Source page 319 · PDF page 319

the critical location, as defined by the largest stress intensity factor range under the expected service loading range including the ground–air–ground cycle. It is recommended that full scale fatigue testing be undertaken to provide an understanding of the fatigue behavior of the component in support of the chosen methodology. In particular it ensures hot spots are identified, which experience has shown analysis often fails to identify.

(3) A threat assessment (see paragraph f.(5)) should be performed to support establishing the BEC size to be used. It is intended that the BEC conservatively bounds the most severe defect resulting from manufacturing, maintenance, or the service environment. That is, there should be no probable defect, from any source, that would lead to failure of the part in less time than it would take the BEC to reach critical size. It should be noted that the resulting crack is a mathematical expedient that may not represent a true physical crack. If the BEC is defined by analytical back calculations from coupon or service fatigue life data, it will be highly dependent on the predictive tool used (i.e., growth algorithm, material data, etc.). Therefore, the same predictive tool must be used to perform the fatigue tolerance evaluation. When the BEC is based upon test or service data, it must account for material variability in initiation and growth.

(4) To determine the retirement, the BEC should be assumed at the critical location and the crack growth characteristics should be determined for the expected load and environment spectrum. There are three different scenarios that could result from a crack growth assessment and be used for establishing a retirement time. These scenarios are illustrated in Figure AC 29.571B-2, Figure AC 29.571B-3, and Figure AC 29.571B-4.

(B) No Growth. The no crack growth scenario is illustrated in Figure AC 29.571B-2. Here the BEC does not grow when using top-of-scatter crack growth rate data. In this case the retirement time should not exceed the design service life (LDES).

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 27-1B

Related technical context

Engineering context
Evidence and scope

AC 27-1B and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source
CS-29

Related technical context

Engineering context
Evidence and scope

CS-29 and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.