FAA Advisory circularActive

AC 29-2C

Certification of Transport Category Rotorcraft

29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28

Scope, source and reading notes

Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.

Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013

Source page 311 · PDF page 311

(i) The usage and loading spectrum should be developed so that it is unlikely that the actual usage and loads will cause fatigue damage or crack growth rates beyond those associated with the defined spectrum used in the fatigue tolerance evaluation. The usage spectrum allocating percentage of time or frequencies of occurrence to flight conditions or maneuvers should be based on the expected usage of the rotorcraft. Considerations should include flight history, recorded flight data, design limitations established in static strength requirements, and recommended operating conditions and limitations specified in the rotorcraft flight manual.

(ii) The fatigue load spectrum developed for fatigue testing and analysis purposes should be representative of the anticipated service usage. Low amplitude load levels that can be shown not to contribute fatigue damage may be omitted (truncated). Simplification of the spectrum loads may also include summing (binding) of percent times or cycles with common steady and vibratory load values.

(iii) The steady state, transient, and vibratory flight load assigned to each regime in the spectrum and utilized in the fatigue tolerance evaluations for each condition should take into account combinations of altitude, center of gravity (CG), gross weight (GW), airspeed, etc., considered to be representative of expected GW/CG mission configurations.

(iv) The usage spectrum should be presented to the FAA for their concurrence. It should include normal operation over the range of rotorcraft configurations including a percent time under ‘external load’ conditions. This spectrum should represent a “composite worst-case” compilation that includes all of the critical conditions that the rotorcraft is expected to experience during performance of the design missions.

(v) AC 27-1B MG 11, provides further detail for the development of the usage spectrums used in the fatigue tolerance evaluations.

(5) Threat Assessment.

(i) A determination should be made of all potential threats that could occur during the manufacturing and service life that may cause damage to each PSE. A threat assessment should be performed for each PSE. To acquire sufficient knowledge of the component and of its global environment, the following items must be identified:

(A) manufacturing process.

(B) quality control process.

(C) prescribed storage, transport, handling, assembly and maintenance aspects of the component, and of the surrounding components.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 27-1B

Related technical context

Engineering context
Evidence and scope

AC 27-1B and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source
CS-29

Related technical context

Engineering context
Evidence and scope

CS-29 and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.