Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.
Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013
(MANUAL IDENTIFICATION) CHAPTER 5 INSPECTION REQUIREMENTS AND OVERHAUL SCHEDULE (continued)
(b) Aircraft information (registration number, serial number, total time in service). (c) General information about the inspection.
(d) Provide a block for the inspector or maintenance personnel to initial when each item has been inspected or action taken. (e) Provide a signature line for the inspector and maintenance personnel to sign when the inspection has been accomplished. (f) Provide a place to enter the date the inspection was completed.
(2) Pre-Inspection activities such as: (a) Maintenance records review.
(b) Airworthiness Directive review. (c) Overhaul and Life Limits requirements review.
(3) Maintenance Practices are associated with an inspection such as:
(a) Removal of cowling, panels, plates and covers to access items being inspected. (b) Cleaning of the item to be inspected. Specify type and number of cleaning material. (c) Specify tools and/or equipment required for the particular inspection, i.e., Torque wrench, Hydraulic unit, etc.
(4) The Inspection should include:
(a) Locate the item(s) to be inspected. (b) Identify what the inspector should be inspecting for (security, wear, damage, corrosion, etc.) (c) Instructions specified for that inspection. (d) Using the required Inspection techniques. (e) Using tools and equipment specified for that inspection. (f) Determine that the item(s) being inspected meet the airworthiness standard established for that product or appliance. (g) Recording of inspection findings. # NOTE: Most of the above information is normally contained in an inspection form which inspection personnel could copy and use.
(5)Type of action to be taken when inspected item is unsatisfactory.
(6 Post Inspection actions such as:
(a) Application of protective coatings removed for inspection. (b) Servicing and lubrication requirements (c) Installation of cowling, panels, plates and covers removed for inspection. (d) Post inspection run up and system operation. (e) Maintenance record entry.
REVISION: (PAGE NUMBER) Revision 4 05-00-00 Page 2
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source