FAA Advisory circularActive

AC 29-2C

Certification of Transport Category Rotorcraft

29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28

Scope, source and reading notes

Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.

Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013

Source page 1361 · PDF page 1361

(MANUAL IDENTIFICATION) LIST OF EFFECTIVE PAGES

LIST OF REVISIONS Revision 0 (Original Issue)..................August 4, 1997 Revision 1 ..................................……January 30,1998 Revision 2 …………………………………June 18,1998 Revision 3 ……………………………..October 21,1999 Revision 4 ……………………………….August 4, 2000

LIST OF EFFECTIVE PAGES Title Pages Revision No. COVER i, ii BLANK 4 RECORD OF REVISION iii, iv BLANK 4 LIST OF EFFECTIVE PAGES v THRU vi 4 TABLE OF CONTENTS vii THRU x 4 CHAPTER 1 INTRODUCTION 01-00-00 1 THRU 8 4 CHAPTER 4 AIRWORTHINESS LIMITATION SECTION 04-00-00 1, 2 BLANK 4 CHAPTER 5 INSPECTIONS 05-00-00 1 THRU 4 4 CHAPTER 6 DIMENSION AND ACCESS 06-00-00 1, 2 BLANK 3 CHAPTER 7 LIFTING AND SHORING 07-00-00 1, 2 BLANK 2 CHAPTER 8 LEVELING AND WEIGHING 08-00-00 1, 2 BLANK 3 CHAPTER 9 TOWING AND TAXIING 09-00-00 1, 2 BLANK 2 CHPATER 10 PARKING AND MOORING 10-00-00 1, 2 BLANK 4 CHAPTER 11 PLACARDS AND MARKING 11-00-00 1, 2 BLANK 4 CHAPTER 12 SERVICING 12-00-00 1, 2 BLANK 2 CHAPTERS 20, 51, 60, 70, STANDARD PRACTICES ( )-00-00 1, 2 BLANK 3 CHAPTERS 21, 22, 23, 24, 25, 26, 27, 29, 30, 31, 33, 34, 35, 36, 37, 45, 49, AIRFRAME SYSTEM ( )-00-00 52, 53, 54, 55, 56, STRUCTURES ( )-00-00 62, 63, 64, 65, 66, 67 ROTORS ( )-00-00 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, and 83 POWERPLANT ( )-00-00 1,2 ,3, 4, 5, 3 6, 7, 8 4

Attachment 1 PART 29 REQUIREMENTS 1, THRU 5, 6 BLANK 4 Attachment 2 INSTRUCTIONS FOR CONTINUED AIRWORTHINESS PROCEDURE INFORMATION 1 AND 2 3 Attachment 3 ATA CHAPTER LISTING 1, 2 BLANK 3 Attachment 4 TYPE DESIGN CHANGE ICA RECOMMENDED PROCEDURE 1, THRU 9,10 BLANK 4

REVISION: (PAGE NUMBER) Page v Revision 4

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 27-1B

Related technical context

Engineering context
Evidence and scope

AC 27-1B and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source
CS-29

Related technical context

Engineering context
Evidence and scope

CS-29 and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.