FAA Advisory circularActive

AC 29-2C

Certification of Transport Category Rotorcraft

29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28

Scope, source and reading notes

Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.

Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013

Source page 1318 · PDF page 1318

Note: Not all ATA chapters or subchapters have been included. Also, the italicized entries are not usually included in the failure condition description but in the systems description or assumptions section.

ATA 24-00-00 – ELECTRICAL POWER

Phase of Operation

Classification of the FC

Notes (assumptions)

Supporting Material

Verification Method

ATA Function Description

Failure Condition (FC)

Effect of the Failure on the Aircraft, Crew and Occupants

Total loss of ALL Aircrew workload would Analysis and ALL significantly increase due / or test electrical to increased difficulty power in discerning the aircraft VFR (night) attitude via outside approved references. rotorcraft (e.g., comm., NAV, attitude, altitude, airspeed, etc.). Loss of ALL A significant reduction in Analysis and primary safety margins due to test electrical loss of redundant power power and of a critical flight system. the aircraft is equipped Aircrew workload would with slightly increase to electrical / compensate for any electronic power-shed equipment. flight controls (fly by wire).

Figure AC 29 MG 21-1. Generic Examples by ATA.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 27-1B

Related technical context

Engineering context
Evidence and scope

AC 27-1B and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source
CS-29

Related technical context

Engineering context
Evidence and scope

CS-29 and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.