AC 29-2C
Certification of Transport Category Rotorcraft
29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28
Scope, source and reading notes
Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.
Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013
(ii) Due to the subjective nature of many of the HF aspects of the regulations, the certification authorities encourage applicants to carefully consider and thoroughly describe the means they intend to use to demonstrate compliance with each regulation. The applicant may choose to provide the detailed description of the means of compliance in subsequent submitted test plans. Use the information contained in the discussion for each regulation, presented in paragraph g.(2), to assess the appropriateness and adequacy of the chosen methods. The certification authority and the applicant should meet to discuss and reach agreement as to the acceptability of the proposed techniques prior to the collection of compliance demonstration data. Demonstrate compliance through similarity and minimal testing for simple and straightforward applications that have little impact on pilot workload, system awareness, tasking, or performance.
(iii) More complex, integrated designs may require pilot evaluation under actual anticipated flight conditions after the performance of analytical and component- level bench evaluations. For these tests, it is critical the flight test pilots are objective regarding their performance using systems and controls. If using pilots other than test pilots, observers should be alert to possible differences between how the pilot performs and interfaces with a system and the pilot’s ratings. The test program should include sufficient simulation and flight testing to ensure::
(A) Reasonable training times and learning curves.
(B) Acceptable interpretation and operation error rates equivalent to or less than previously certificated comparable systems.
(C) The intended user (pilot) of the system does not require any exceptional skill, strength, or alertness to operate the system.
(D) Proper integration and compatibility with other controls or displays, or both, and with other equipment in the cockpit.
(iv) Typically, rotorcraft systems are designed, as a minimum, to prevent hazards to the rotorcraft if they malfunction or fail. Therefore, if a system failure occurs, the pilot should be able to continue safe operation of the rotorcraft. Pay particular attention to the hazards of presenting misleading information to the pilot in the event of a malfunction. Applicants are encouraged to conduct early analyses and evaluations of new systems to facilitate timely identification and resolution of HF related certification issues.
(2) The following is a partial listing of the HF-related regulations and associated discussion of each of those regulations with considerations for demonstration of compliance.
(i) Section 29.672.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source