AC 29-2C
Certification of Transport Category Rotorcraft
29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28
Scope, source and reading notes
Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.
Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013
(2) Active navigation information (waypoint name, etc.), should be as close to the top of the display as possible to minimize the pilot’s scan between the PFD and ND.
(B) Format.
(1) The HSI or compass rose format should have a full 360o display. If an arc feature is included, the arc should display at least 120o of heading. In arc mode, if the heading bug is off the display, there should be a means to indicate to the pilot what heading the bug is set on.
(2) The rest of the displayed information format should allow for easy assessment and interpretation by the pilot.
(3) Overlays of TCAS, HTAWS, or weather information should not interfere with the use of the ND for primary navigation tasks. There should be definition of the prioritization of overlay pop-ups, if installed.
(6) Powerplant and Systems Information.
(i) Powerplant. EDS display suites may or may not include the capability of displaying powerplant parameters required by § 29.1305 along with electrical system information required by § 27.1351and hydraulic system information required by § 29.1435. Displaying powerplant information on a single display, as opposed to displaying the information in separate gauges, decreases the independence of information. As a result, EDS powerplant display (EICAS, IIDS, etc.) design should be robust enough so that information availability and validity is commensurate with the assessed FHA failure condition classification.
(A) Arrangement.
(1) 14 CFR 29.1321 and Appendix B (VIII) to part 29 specify placement of information relative to the pilot’s field of view. Refer to section 29.1321 and Appendix B of this AC for further guidance.
(2) Torque, power turbine temperature, power turbine speed, main rotor speed, and free turbine speed should continuously display in the pilot’s primary field of view. The format for these parameters can vary and is discussed below.
(3) Display of engine oil temperature and pressure and main gearbox oil temperature (and pressure if required) should continuously display. If positioned in the pilot’s secondary field of view, they should be as close to the pilot’s primary field of view as possible.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source