AC 29-2C
Certification of Transport Category Rotorcraft
29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28
Scope, source and reading notes
Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.
Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013
(3) Symbology.
(i) One benefit of symbol standards versus other information formats is the compact encoding of information, which minimizes clutter. With careful planning, base the use of symbols upon established industry standards. SAE ARP 4102/7 and ARP 5289 standards provide examples of accepted symbols and symbol sets for PFDs and MFD-navigation displays.
(A) Symbolic encoding of information should remain sufficiently simple for pilots to learn and recall (see section AC 29 MG-20, Human Factors, of this AC). To minimize confusion or misinterpretation, symbols should be easily distinguishable, consistent within the cockpit, and learned with minimal training.
(B) Symbols should not have shapes, colors, or other attributes that are ambiguous or could be confused with the meaning of similar symbols.
(C) The function of symbology should be clear definition and appropriate classification for pilot understanding. Symbols representing the same functions on more than one display should be the same.
(ii) HTAWS, automatic dependent surveillance-broadcast (ADS-B), TCAS, and other applications each have their own defined symbol sets. If these features are included in the installation and will use the EDS displays to show information, then the EDS should use each application’s (HTAWS, ADS-B, TCAS, etc.) defined symbol set. Assess the symbol sets to ensure they do not contain similar symbology with different meanings.
(iii) The EDS design and integration should provide a means to reduce or “declutter” the EDS of non-essential symbology.
(4) Clutter.
(i) Computer generated displays provide the ability to present a multitude of information. As a result, numerous formats are possible with an electronic display system. However, excessive information on a limited display size can result in clutter, resulting in reduced efficiency of pilot cues, pilot scan, and detection.
(A) The density of information on the display should be compatible with the pilot's ability to recognize essential information and to minimize misinterpretation. At times, pilots may wish to reduce clutter by removing the display of symbols otherwise used during specific phases of flight.
(B) There should be an information prioritization scheme established to ensure the clear presentation of essential information.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source