AC 29-2C
Certification of Transport Category Rotorcraft
29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28
Scope, source and reading notes
Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.
Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013
does not increase or significantly change the focus of pilot workload in order to manage and operate the system.
(iv) EDSs have the capability to combine the display of multiple flight, navigation, and powerplant parameters on to a single display, resulting in the loss of independence provided by individual gauges or instruments. As a result, considerations regarding loss of required information must account for a possible single failure leading to the loss of all flight, navigation, or powerplant information on a display.
(2) Basic flight and navigation information.
(i) 14 CFR 29.1303 and Appendix B to part 29 define required flight and navigation instruments.
(ii) Flight Instruments: There are different instrument requirements for VFR and IFR rotorcraft (see Appendix B to part 29, VIII). Consult operational regulations (e.g., parts 91 and 135) for any additional flight instrument requirements. Flight instruments that are not required by § 29.1303 but are installed to satisfy either an operational requirement or to enhance safe operation of the rotorcraft should be located as close as possible to the pilots’ center line of vision. For example, radar altimeters should be installed where pilots can easily incorporate the gauge into their airspeed and altitude scan. Placing a radar altimeter or other flight instruments at the maximum extent of the pilots’ secondary field of view makes the instrument difficult to incorporate into an efficient scan and increases pilots’ workload.
(iii) Navigation information.
(A) The display of navigation information can be either on the PFD or on an EHSI Supplemental navigation information, such as moving maps, can be displayed on MFDs. . However, the EHSI or PFD should provide the pilot with course and heading adherence, coupled with the information required for the pilot to attain and maintain awareness of the rotorcraft’s position relative to navigation waypoints and action points.
(B) Navigation equipment requirements are also given in operational rules (For example, §§ 91.205 , 135.143, and 121 Subpart K). Display requirements for navigation information depend on which navigation system is installed in the rotorcraft. Electronic display installations may affect the instruments and equipment required for flights under part 91 and part 135. These instruments and equipment include gyroscopic bank and pitch, gyroscopic direction, gyroscopic rate-of-turn, slip-skid instruments, and other required communication and navigational equipment.
(iv) Arrangement and visibility of primary flight and navigation information. Place the primary flight and navigation information in the pilot’s primary field of view. Figure AC 29 MG 19-1 illustrates the primary field of view. Due to rotorcraft instrument panel design, the display of some information may be located below -15° and will need
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source