AC 29-2C
Certification of Transport Category Rotorcraft
29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28
Scope, source and reading notes
Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.
Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013
• Check filter condition for fogging, crazing, cracking, etc., which impairs unaided readability of the instrument or gauge to which the filter is applied.
• Check NVIS lighting for light leakage and compatibility.
• NVG adjustment and alignment.
• Check function of additional NVIS equipment.
• Interior configuration check for NVIS equipment (e.g., deselect incompatible light sources).
• Exterior configuration check for NVIS equipment (e.g., position lights, taxi and landing light, search light are selected to correct mode, if applicable).
• Adjust lighting as required.
4.1.2 In-flight.
• Control of cockpit and external NVIS illumination. Adjust lighting, as required.
• Transition to aided from unaided operations (and vice versa), as necessary.
• Radar altimeter and additional equipment procedures, as necessary.
4.1.3 Post flight. Report NVIS lighting or equipment and windscreen/transparency discrepancies.
5. WEIGHT AND BALANCE. The weight and balance should include the installation of NVIS equipment. Provide a sufficiently detailed system description. Refer to AC 43.13-1B, Chapter 10 for additional guidance.
(End of the section of one template for use as an RFMS.)
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source