AC 29-2C
Certification of Transport Category Rotorcraft
29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28
Scope, source and reading notes
Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.
Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013
from separate buses and independent sources. (See §§ 29.1309, 29.1331, 29.1333, 29.1351, and 29.1355.)
(B) Navigation course deviation circuit loading. It should be determined that the impedance of the deviation circuit source matches its load and does not exceed the source capacity. Consider the transfer loads when the system is capable of transfer (§ 29.1301).
(C) Malfunction indicator circuit loading. It should be determined that the impedance of the malfunction indicator source matches its load and does not exceed the source capacity. Consider the transfer loads when the system is capable of transfer (§ 29.1301).
(D) Synchro signal loading. When adding parallel loads to synchros, review the manufacturers’ specifications to assure that the additional loads do not result in an overloaded synchro.
(iv) Interface. In many cases, different manufacturers design the mating units of a system. For example, a brand-X gyro may be designed for operation with a brand-X flight director, but later a modifier decides to operate a brand-Y autopilot with the brand-X gyro. This applies just as well to navigational (NAV) receivers, Area NAV (RNAV) units, course indicators, omni bearing selectors, tachometer indicators, transmitters and many other equipment items. When this is the case, the applicant should provide data, in summarized form, describing those characteristics such as impedance, volts, etc., that are necessary to assure a compatible and reliable system. The data should also reference the source of the interface data (§ 29.1301).
(v) Flight Tests. An FAA engineering flight test is required during type certification or after modification that changes the established limitations, flight characteristics or performance of a rotorcraft or any of its required systems or operating procedures. Appropriate flight test personnel should evaluate new installations of equipment in the cockpit or modifications that affect existing equipment in the cockpit if it is necessary to evaluate operational aspects of the change. If the applicant opts to darken the windows, evaluate the cockpit arrangement, placards, markings, instrument visibility, and light reflections on the ground, where possible. Electromagnetic compatibility functional checks, windshield glare, and pilot workload evaluations may be conducted in flight at the FAA flight test pilot’s option.
(vi) Radio Master Switches. Some installations incorporate radio master switches to control special busses for the avionics systems. If providing this capability, evaluate it to ensure failure modes that result in excessive or even total loss of all required avionics are not introduced. One switch that controls all required avionics is unacceptable for instrument flight rules (IFR) installations. The evaluation should include an assessment of the loss of the systems to be included on the radio master switches and the subsequent effect on continued safe flight.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source