CS-23
Normal-Category Aeroplanes
CS Amendment 6; AMC/GM Issue 5 Source checked 2026-11-28
Scope, source and reading notes
Complete Easy Access Rules consolidation of CS-23 Amendment 6 and related AMC/GM Issue 5.
Aerospace Consulting reference note: Current consolidated certification specifications and related compliance guidance for normal-category aeroplanes.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 86ad4923e633b90fc84b90ff5ab4b1caade703896da2ee03657437e1cde181b1
CS 23.2430 Powerplant installation, energy storage and distribution systems ................................................................................................ 87
AMC1 23.2430 Powerplant installation, energy storage and distribution systems ......................................................................................................................... 88
AMC2 23.2430 Powerplant installation, energy storage and distribution systems ......................................................................................................................... 88
AMC3 23.2430 Powerplant installation, energy storage and distribution systems ......................................................................................................................... 89
CS 23.2435 Powerplant installation support systems ............................ 90
AMC1 23.2435 Powerplant installation support systems .................................... 90
AMC2 23.2435 Powerplant installation support systems .................................... 90
AMC3 23.2435 Powerplant installation support systems .................................... 91
CS 23.2440 Powerplant installation fire protection ............................... 91
AMC1 23.2440 Powerplant installation fire protection ....................................... 91
AMC2 23.2440 Powerplant installation fire protection ....................................... 92
AMC3 23.2440 Powerplant installation fire protection ....................................... 92
CS 23.2445 Powerplant installation information .................................. 93
AMC1 23.2445 Powerplant installation information ........................................... 93
AMC2 23.2445 Powerplant installation information ........................................... 93
AMC3 23.2445 Powerplant installation information ........................................... 93
SUBPART F — SYSTEMS AND EQUIPMENT .................................... 94
CS 23.2500 General requirements on systems and equipment function 94
AMC1 23.2500 General requirements on systems and equipment function ........ 94
AMC2 23.2500 General requirements on systems and equipment function ........ 95
AMC3 23.2500 General requirements on systems and equipment function ........ 96
CS 23.2505 General requirements on equipment installation ............... 96
AMC1 23.2505 General requirements on equipment installation ....................... 97
AMC2 23.2505 General requirements on equipment installation ....................... 97
AMC3 23.2505 General requirements on equipment installation ....................... 97
CS 23.2510 Equipment, systems, and installations................................ 97
AMC1 23.2510 Equipment, systems, and installations ........................................ 98
AMC2 23.2510 Equipment, systems, and installations ........................................ 98
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 23.2010-1 and CS-23 — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source