EASA Certification Specifications with AMC/GMFinal — current published edition checked

CS-23

Normal-Category Aeroplanes

CS Amendment 6; AMC/GM Issue 5 Source checked 2026-11-28

Scope, source and reading notes

Complete Easy Access Rules consolidation of CS-23 Amendment 6 and related AMC/GM Issue 5.

Aerospace Consulting reference note: Current consolidated certification specifications and related compliance guidance for normal-category aeroplanes.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 86ad4923e633b90fc84b90ff5ab4b1caade703896da2ee03657437e1cde181b1

Source page 12 · PDF page 12

AMC1 23.2330 Fire protection in designated fire zones ............................................ 75 AMC2 23.2330 Fire protection in designated fire zones ............................................ 76 AMC3 23.2330 Fire protection in designated fire zones ............................................ 76

CS 23.2335 Lightning protection ........................................................................ 76

AMC1 23.2335 Lightning protection ......................................................................... 76 AMC2 23.2335 Lightning protection ......................................................................... 76 AMC3 23.2335 Lightning protection ......................................................................... 77

CS 23.2340 Design and construction information ............................................... 77

AMC1 23.2340 Design and construction information ................................................ 77 AMC2 23.2340 Design and construction information ................................................ 77 AMC3 23.2340 Design and construction information ................................................ 77

SUBPART E — POWERPLANT INSTALLATION ................................. 78

CS 23.2400 Powerplant installation ...................................................... 78

AMC1 23.2400 Powerplant installation .............................................................. 78

AMC2 23.2400 Powerplant installation .............................................................. 79

AMC3 23.2400 Powerplant installation .............................................................. 80

CS 23.2405 Power or thrust control systems ......................................... 81

AMC1 23.2405 Power or thrust control systems ................................................. 82

AMC2 23.2405 Power or thrust control systems ................................................. 82

AMC3 23.2405 Power or thrust control systems ................................................. 82

CS 23.2410 Powerplant installation hazard assessment ........................ 82

AMC1 23.2410 Powerplant installation hazard assessment ................................ 83

AMC2 23.2410 Powerplant installation hazard assessment ................................ 83

AMC3 23.2410 Powerplant installation hazard assessment ................................ 84

CS 23.2415 Powerplant installation ice protection ............................... 84

AMC1 23.2415 Powerplant installation ice protection ........................................ 84

AMC2 23.2415 Powerplant installation ice protection ........................................ 85

AMC3 23.2415 Powerplant installation ice protection ........................................ 85

CS 23.2420 ........................................................................................... 85

CS 23.2425 Powerplant operational characteristics .............................. 85

AMC1 23.2425 Powerplant operational characteristics ...................................... 86

AMC2 23.2425 Powerplant operational characteristics ...................................... 86

AMC3 23.2425 Powerplant operational characteristics ...................................... 86

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 23.2010-1

Related technical context

Engineering context
Evidence and scope

AC 23.2010-1 and CS-23 — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.