EASA Certification Specifications with AMC/GMFinal — current published edition checked

CS-23

Normal-Category Aeroplanes

CS Amendment 6; AMC/GM Issue 5 Source checked 2026-11-28

Scope, source and reading notes

Complete Easy Access Rules consolidation of CS-23 Amendment 6 and related AMC/GM Issue 5.

Aerospace Consulting reference note: Current consolidated certification specifications and related compliance guidance for normal-category aeroplanes.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 86ad4923e633b90fc84b90ff5ab4b1caade703896da2ee03657437e1cde181b1

Source page 88 · PDF page 88

AMC1 23.2430 Powerplant installation, energy storage and distribution systems

ED Decision 2026/003/R

ASTM F44 F3264 Standard Specification for Normal Category Aeroplanes Certification

8.7 Fuel and Energy Storage and Distribution Systems

F3062/F3062M-20 Standard Specification for Aircraft Powerplant Installation

F3063/F3063M-21 Standard Specification for Aircraft Fuel Storage and Delivery

F3064/F3064M-21 Standard Specification for Aircraft Powerplant Control, Operation, and Indication

F3066/F3066M-18 Standard Specification for Aircraft Powerplant Installation Hazard Mitigation

F3114-21 Standard Specification for Structures

F3397/F3397M Standard Practice for Aeroplane Turbine Fuel System Hot Weather Operations

Remarks

ASTM F44 published standards for showing compliance for electric propulsion systems. EASA has not yet accepted F3239-22a; however, EASA would take into consideration applications from applicants that use this standard as the basis for the development of their means of compliance subject to agreement with EASA.

[AMC & GM to CS-23: Issue 4]

[AMC & GM to CS-23: Issue 5]

AMC2 23.2430 Powerplant installation, energy storage and distribution systems

ED Decision 2017/025/R

CS-23 Amdt 4

23.951 Fuel System - General

23.953 Fuel system independence

23.954 Fuel system lightning protection

23.955 Fuel flow

23.957 Flow between interconnected tanks

23.959 Unusable fuel supply

23.961 Fuel system hot weather operation

23.963(a), (d), (e) Fuel tank: general

23.965 Fuel tank tests

23.967(a), (c), (d), (e) Fuel tank installation

23.969 Fuel tank expansion space

23.971 Fuel tank sump

23.973 Fuel tank filler connection

View figures, tables and original page layoutOriginal source page Source page 88 · PDF page 88 of CS-23

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 23.2010-1

Related technical context

Engineering context
Evidence and scope

AC 23.2010-1 and CS-23 — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.