EASA Acceptable Means of ComplianceFinal — current published edition checked

AMC 20-193

Use of multi-core processors

Current AMC; incorporated in AMC-20 Amendment 23 Source checked 2026-11-28

Scope, source and reading notes

Certification considerations for airborne systems and equipment using multi-core processors.

Aerospace Consulting reference note: Addresses multi-core processor interference, resource use, verification and supporting certification evidence.

Complete selected AMC and associated material, from PDF pages 592–603 of the AMC-20 consolidation. The original PDF contains the whole consolidation. Reading text is extracted; original figures and layout remain available.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b3d02d6ad4cd2833f79be85634221f52ea8bd90a84c733257193e4a60a2d536a

Source page 600 · PDF page 600

Notes:

a) All the interfaces between the hosted software and the hardware of the MCP should be included in this testing.

b) The robustness testing mentioned above is intended to cover the specific aspects of an MCP that are not specifically covered by the standard verification activities described in the applicable software guidance.

c) If the highest IDAL of the MCP hardware and of all the software applications hosted on the MCP is C, and the hosted software applications are not required by the safety analysis to be robustly partitioned, then the applicant has the option to not conduct an interference analysis and therefore to not meet Objective MCP_Resource_Usage_3. In such a case where no interference analysis has been performed, the hosted software components should be verified according to this objective as components for which interference is not avoided or mitigated and for which separate verification is, therefore, not permitted.

d) To ‘verify separately’ and ‘determine the WCET separately’ mean to conduct these activities without all the software executing at the same time on other cores of the MCP.

e) Interference may occur between tasks of a single component when the tasks execute on different cores.

MCP_Software_2:

The applicant has verified that the data and control coupling between all the individual software components hosted on the same core or on different cores of the MCP has been exercised during software requirement-based testing, including exercising any interfaces between the software components via shared memory and any mechanisms to control the access to shared memory, and that the data and control coupling is correct.

Notes:

a) When this objective cannot be completely met during the software verification, applicants may propose to use system-level testing to exercise the data and control coupling between software components hosted on different cores.

b) Interference may occur between tasks of a single component when the tasks execute on different cores.

5.5. Error detection and handling, and safety nets

As well as the types of errors and failures normally detected and handled in a system that incorporates a single-core processor, additional types of errors and failures may need to be detected and handled in an MCP environment due to problems caused by the features of MCPs and due to the additional complexity of executing several software applications or tasks in parallel in real time.

Features of an MCP may, therefore, contain unintended functionality that may cause errors and produce unexpected behaviour. Applicants may, therefore, wish to consider the use of a ‘safety net’ independent from the MCP to detect and handle failures within the MCP and to contain any such failures within the equipment in which the MCP is installed.

MCP_Error_Handling_1:

The applicant has identified the effects of failures that may occur within the MCP and has designed, implemented, and verified means commensurate with the safety objectives, by which to detect and handle those failures in a fail-safe manner that contains the effects of any failures within the equipment in which the MCP is installed. These means may include a ‘safety net’ independent from the MCP.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 20-193

Related technical context

Engineering context
Evidence and scope

AC 20-193 and AMC 20-193 — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.