AMC 20-193
Use of multi-core processors
Current AMC; incorporated in AMC-20 Amendment 23 Source checked 2026-11-28
Scope, source and reading notes
Certification considerations for airborne systems and equipment using multi-core processors.
Aerospace Consulting reference note: Addresses multi-core processor interference, resource use, verification and supporting certification evidence.
Complete selected AMC and associated material, from PDF pages 592–603 of the AMC-20 consolidation. The original PDF contains the whole consolidation. Reading text is extracted; original figures and layout remain available.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b3d02d6ad4cd2833f79be85634221f52ea8bd90a84c733257193e4a60a2d536a
— failures of hardware unique to a software partition cannot cause adverse effects on other software partitions.
Note: Software that provides partitioning should have at least the same IDAL as the highest IDAL of the software that it partitions.
Robust time partitioning (on an MCP): this is achieved when, as a result of mitigating the time interference between partitions hosted on different cores, no software partition consumes more than its allocation of execution time on the core(s) on which it executes, irrespective of whether partitions are executing on none of the other active cores or on one, more than one, or all of the other active cores.
Safety net: a safety net is defined as the employment of mitigations and/or protections at the appropriate level of aircraft and system design as a means to satisfy the safety objectives. The safety net methodology may be applied when it is assumed that part of a system will misbehave. The safety net is by nature independent of the source of misbehaviour. The safety net can include passive monitoring functions, active fault avoidance functions, and control functions for effective recovery of system operations from anomalous events.
Simultaneous multithreading: this is when virtual cores are used to execute more than one execution thread on a single physical core.
Software application: generally, it designates the software part of a function installed on an MCP.
Software component: any part of the software which may access MCP shared resources; it may designate either a software application or an operating system or a hypervisor.
Hardware component: any part of the hardware which may independently access MCP shared resources.
Symmetric multi-processing (SMP): an MCP software architecture in which a single operating system controls the execution of the software on multiple cores and may dynamically allocate tasks to cores at run-time.
Task: the smallest unit of software execution that can be managed independently by a scheduler. For the purposes of this AMC, this term encompasses ‘threads’ or ‘processes’ (in the sense of ARINC 653). For simplification in this AMC, when addressing interference, a task also represents any part of an application or any part of a software component that executes on one core.
5. Multi-core processor (MCP) guidance
This section takes stages of a typical life cycle of a project involving an MCP in turn, explains the important issues involved in each stage, and provides objectives for applicants to meet for each of those stages.
The applicant should meet the objectives of this AMC, with the exception of any objective or part of an objective that the applicant justifies as not being applicable to the MCP in their system or equipment (e.g. if the MCP mechanism addressed does not exist on the selected MCP). The applicant should state in the appropriate deliverable document which particular aspects do not apply and explain why they do not apply.
Some of the objectives have notes provided after them. These notes should be considered to be part of the objectives, as they provide additional information that is relevant to the objectives. Objectives and their included notes are formatted in italics to differentiate them from the rest of the text.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 20-193 and AMC 20-193 — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source