AMC 20-193
Use of multi-core processors
Current AMC; incorporated in AMC-20 Amendment 23 Source checked 2026-11-28
Scope, source and reading notes
Certification considerations for airborne systems and equipment using multi-core processors.
Aerospace Consulting reference note: Addresses multi-core processor interference, resource use, verification and supporting certification evidence.
Complete selected AMC and associated material, from PDF pages 592–603 of the AMC-20 consolidation. The original PDF contains the whole consolidation. Reading text is extracted; original figures and layout remain available.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b3d02d6ad4cd2833f79be85634221f52ea8bd90a84c733257193e4a60a2d536a
Objective MCP_Planning_2:
The applicant’s plans or other deliverable documents:
1. Provide a high-level description of how MCP shared resources will be used and how the applicant intends to allocate and verify the use of shared resources (see Note a) so as to avoid or mitigate the effects of contention for MCP resources and to prevent the resource capabilities of the MCP from being exceeded by the demands from the software applications and/or the hardware components of the MCP.
2. Identify the MCP hardware resources to be used to support the objectives in this AMC.
3. Identify any hardware dynamic features of the MCP that will be active, and provide a high-level description of how they will be used.
4. Identify the aspects of the use of the MCP that may require a safety net or other mechanisms to detect and handle failures in the MCP.
Notes:
a) The description of the use of shared resources should include any use of shared cache (taking into account the time interference it may cause due to cache misses or other effects) or shared memory (taking into account the time interference and the data and control flow effects it may cause, such as lockouts, race conditions, data starvation, deadlocks, live-locks, or excessive data latency). The description of shared resources should also include any use of shared interconnect and take into account the time interference due to arbitration for access to the shared interconnect.
b) Hardware dynamic features of the MCP include any features that can alter the behaviour of the MCP or the hosted software during execution — for example, energy-saving features (clock enable / gating, frequency adaptations, deactivating one or more cores, or dynamic control of peripheral access).
5.2. The setting of MCP resources
In the context of MCPs, some of the configuration settings are especially relevant to the MCP hardware and software architectures, such as:
— which cores are activated;
— the execution frequencies of the cores;
— the priorities and allocation of shared interconnect;
— which of the peripheral devices of the MCP are activated;
— whether shared memory or shared cache is used, and how each is allocated; and
— whether dynamic features that are built into some MCPs are allowed to alter the frequency of execution of the cores or to deactivate one or more cores in order to save energy (this might not be desirable for cores that host safety-critical software applications).
Objective MCP_Resource_Usage_1: The applicant has determined and documented the MCP configuration settings that will enable the hardware and the software hosted on the MCP to satisfy the functional, performance, and timing requirements of the system.
Objective MCP_Resource_Usage_2: RESERVED. Covered by AMC 20-152A, Objective COTS-8.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 20-193 and AMC 20-193 — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source