EASA Acceptable Means of ComplianceFinal — current published edition checked

AMC 20-193

Use of multi-core processors

Current AMC; incorporated in AMC-20 Amendment 23 Source checked 2026-11-28

Scope, source and reading notes

Certification considerations for airborne systems and equipment using multi-core processors.

Aerospace Consulting reference note: Addresses multi-core processor interference, resource use, verification and supporting certification evidence.

Complete selected AMC and associated material, from PDF pages 592–603 of the AMC-20 consolidation. The original PDF contains the whole consolidation. Reading text is extracted; original figures and layout remain available.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b3d02d6ad4cd2833f79be85634221f52ea8bd90a84c733257193e4a60a2d536a

Source page 598 · PDF page 598

5.3. Interference channels and resource usage

As stated above, the software applications or tasks that execute on different cores of an MCP share MCP resources; so, even if there is no explicit data or control flow between these software applications or tasks, coupling exists on the platform level, which can cause interference between them.

There may be software or hardware channels through which the MCP cores or the software hosted on those cores could interfere with each other, in addition to those channels specifically mentioned in this AMC. For instance, many MCPs include an ‘interconnect’ / ‘coherency fabric’, through which the demands for MCP resources (e.g. from the software applications hosted on the MCP) are channelled and the demands are arbitrated. This arbitration can cause interference effects such as jitter on data arrival times, data consistency issues, or it can change the order in which transactions requested by the software applications are executed.

Non-deterministic behaviour of the hosted software applications may occur due to such interference.

Moreover, the complexity of the MCP, executing tasks in parallel and the interference could lead to the demands for resources exceeding the available resources. For instance, if the demands for interconnect transactions are very high in MCPs with a very high level of external databus traffic, the interconnect can become overloaded, which can affect transactions on some MCPs.

MCP_Resource_Usage_3:

The applicant has identified the interference channels that could permit interference to affect the software applications hosted on the MCP cores, and has verified the applicant’s chosen means of mitigation of the interference.

Notes:

a) This objective includes the identification of any interference caused by the use of shared memory, shared cache, an interconnect, or the use of any other shared resources, including shared peripherals, and the verification of the means of mitigation chosen by the applicant.

b) If the applicant identifies interference channels that cannot affect the software applications in the intended final configuration, then those interference channels do not need to be mitigated and no verification of mitigation is needed.

c) The applicant should handle any interference channel discovered at any time during the project in the same manner as in this objective and these explanatory notes.

d) If the highest IDAL of the MCP hardware and of all the software applications hosted on the MCP is C, and the hosted software applications are not required by the safety analysis to be robustly partitioned, then the applicant has the option to not conduct an interference analysis and, therefore, to not meet this objective. However, applicants should note that opting to not meet this objective affects the manner in which they are permitted to conduct their software verification (see Objective MCP_Software_1 and Note c) of that objective.)

MCP_Resource_Usage_4:

The applicant has identified the available resources of the MCP and of its interconnect in the intended final configuration, has allocated the resources of the MCP to the software applications hosted on the MCP, and has verified that the demands for the resources of the MCP and of the interconnect do not exceed the available resources when all the hosted software is executing on the target processor.

Note: The use of worst-case scenarios is implicit in this objective.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 20-193

Related technical context

Engineering context
Evidence and scope

AC 20-193 and AMC 20-193 — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.