AMC 20-193
Use of multi-core processors
Current AMC; incorporated in AMC-20 Amendment 23 Source checked 2026-11-28
Scope, source and reading notes
Certification considerations for airborne systems and equipment using multi-core processors.
Aerospace Consulting reference note: Addresses multi-core processor interference, resource use, verification and supporting certification evidence.
Complete selected AMC and associated material, from PDF pages 592–603 of the AMC-20 consolidation. The original PDF contains the whole consolidation. Reading text is extracted; original figures and layout remain available.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b3d02d6ad4cd2833f79be85634221f52ea8bd90a84c733257193e4a60a2d536a
AMC 20-193
AMC 20-193 Use of multi-core processors
ED Decision 2022/001/R
1. Purpose
1.1 This AMC describes an acceptable means, but not the only means, for showing compliance with the applicable airworthiness specifications for aspects related to multi-core processors (MCPs) contained in airborne systems and equipment used in product certification or ETSO authorisation. Compliance with this AMC is not mandatory, and an applicant may elect to use an alternative means of compliance. However, the alternative means of compliance must meet the relevant requirements, ensure an equivalent level of safety, and be approved by the Agency on a product or ETSO article basis.
1.2 This AMC provides objectives for the demonstration of compliance with the applicable airworthiness specifications for airborne systems and equipment that contain MCPs, according to the applicability in Section 2 of this AMC.
2. Applicability
2.1. This AMC may be used by applicants, design approval holders, and developers of airborne systems and equipment, which contain MCPs, to be installed on type-certified aircraft, engines, and propellers. This also includes developers of ETSO articles.
This AMC applies to systems and equipment that contain MCPs with two or more activated cores for which the item development assurance level (IDAL) of at least one of the software applications hosted by the MCP or of the hardware item that contains the MCP is A, B, or C. The deactivation of cores is handled through the applicable airborne electronic hardware (AEH) guidance.
This AMC does not apply when the IDALs are all Level D or E.
If an applicant modifies the use of the MCP (such as by activating one or more additional cores or adding software of IDAL A, B, or C), then the applicant should reassess the applicability of this AMC.
Section 0 of this AMC describes the objectives that apply according to the assigned IDAL (A, B, or C) of the hosted software or of the hardware item that contains the MCP.
2.2. Aspects not covered by this AMC
The following aspects are not covered by this AMC. This does not constitute an exemption, i.e. the objectives of this AMC are still applicable if an applicant uses these features.
Any applicant who uses these features should describe how they are used so that the behaviour of the MCP is not altered, and determinism is still guaranteed.
In their planning activities, the applicant should present the methods employed to cover these aspects, and satisfy the objectives of this AMC or show compliance with the applicable airworthiness specifications if they propose an alternative to this AMC or part of it.
2.2.1. Dynamic allocation of software applications
An assumption in this AMC is that software applications are statically allocated to cores during the start-up of the MCP software, but not during the subsequent operation of the software.
This AMC does not cover MCP platforms on which software applications or tasks can be dynamically reallocated to a different core (or different cores) by the operating system, a software hypervisor, or by other means.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 20-193 and AMC 20-193 — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source