AMC 20-193
Use of multi-core processors
Current AMC; incorporated in AMC-20 Amendment 23 Source checked 2026-11-28
Scope, source and reading notes
Certification considerations for airborne systems and equipment using multi-core processors.
Aerospace Consulting reference note: Addresses multi-core processor interference, resource use, verification and supporting certification evidence.
Complete selected AMC and associated material, from PDF pages 592–603 of the AMC-20 consolidation. The original PDF contains the whole consolidation. Reading text is extracted; original figures and layout remain available.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b3d02d6ad4cd2833f79be85634221f52ea8bd90a84c733257193e4a60a2d536a
5.4. Software verification
The software verification processes in the applicable software guidance need to be adapted for use on an MCP to demonstrate that the hosted software applications function correctly and have sufficient time to execute in the presence of the interference that occurs when all the hosted software is executing on an MCP.
With an MCP, there may be data and control flows between software components or tasks hosted on different cores of the MCP. Therefore, the data and control coupling analysis performed on the software hosted on each separate core (as required by the applicable software guidance) may not reveal the improper software behaviour associated with features such as hardware runtime optimisations and memory models on MCPs.
The WCET of a software component or task may increase significantly when other software components or tasks are executing in parallel on the other cores of an MCP. This could cause some software applications to have insufficient time to complete the execution of their safety-critical functionality.
Interference and interactions between software applications or tasks occur via the proprietary internal mechanisms of an MCP. Any simulation of those mechanisms is, therefore, less likely to be representative in terms of functionality or execution time than testing conducted on the target MCP in the intended final configuration, and thus is less likely to detect errors.
To adapt the software verification guidance for different types of MCP platforms, the two following categories of MCP platforms are considered:
— MCP platforms with robust partitioning, and
— all other MCP platforms.
MCP_Software_1:
The applicant has verified that all the software components hosted by the MCP meet the objectives of the applicable software guidance. In particular, the applicant has verified that all the hosted software components function correctly and have sufficient time to complete their execution when all the hosted software and hardware of the MCP is executing in the intended final configuration.
The way in which the applicant should satisfy this objective depends on the type of the MCP platform:
— MCP platforms with robust partitioning:
Applicants who have verified that their MCP platform provides both robust resource partitioning and robust time partitioning (as defined in this AMC) may verify software applications separately on the MCP and determine their WCETs separately.
— All other MCP platforms:
Applicants may verify separately on the MCP any software component or set of requirements for which the interference identified in the interference analysis is mitigated or is precluded by design. Software components or sets of software requirements for which interference is not avoided or mitigated should be tested on the target MCP with all software components executing in the intended final configuration, including robustness testing of the interfaces of the MCP.
The WCET of a software component may be determined separately on the MCP if the applicant shows that time interference is mitigated for that software component; otherwise, the WCET should be determined by analysis and confirmed by test on the target MCP with all the software components executing in the intended final configuration.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 20-193 and AMC 20-193 — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source