EASA Acceptable Means of ComplianceFinal — current published edition checked

AMC 20-193

Use of multi-core processors

Current AMC; incorporated in AMC-20 Amendment 23 Source checked 2026-11-28

Scope, source and reading notes

Certification considerations for airborne systems and equipment using multi-core processors.

Aerospace Consulting reference note: Addresses multi-core processor interference, resource use, verification and supporting certification evidence.

Complete selected AMC and associated material, from PDF pages 592–603 of the AMC-20 consolidation. The original PDF contains the whole consolidation. Reading text is extracted; original figures and layout remain available.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: b3d02d6ad4cd2833f79be85634221f52ea8bd90a84c733257193e4a60a2d536a

Source page 601 · PDF page 601

5.6. Data to complement the accomplishment summaries

The applicant is expected to describe how the objectives of this AMC were satisfied.

MCP_Accomplishment_Summary_1:

In addition to providing the information requested by the applicable software and AEH guidance, the applicant has provided documentation that summarises how they have met each of the objectives of this AMC.

5.7. Applicability of the MCP objectives according to their IDALs

The column ‘IDAL A or B’ shows the objectives applicable when the highest IDAL of any of the software applications hosted by the MCP or of the MCP hardware device is A or B.

The column ‘IDAL C’ shows the objectives applicable when the highest IDAL of any of the software applications hosted by the MCP or of the MCP Hardware device is C.

n/a

MCP OBJECTIVES IDAL A or B IDAL C MCP_Planning_1 Yes Yes MCP_Planning_2 Yes Yes MCP_Resource_Usage_1 Yes Yes MCP_Resource_Usage_2 Covered by AMC 20-152A Objective

COTS-8

MCP_Resource_Usage_3 Yes Refer to Note d MCP_Resource_Usage_4 Yes No MCP_Software_1 Yes Yes MCP_Software_2 Yes Yes MCP_Error_Handling_1 Yes No

MCP_Accomplishment_Summary_1 Yes Yes

6. Related Regulatory, Advisory, and Industry Material

(a) Related EASA Certification Specifications (CSs)

(1) CS-23 Certification Specifications and Acceptable Means of Compliance for Normal, Utility, Aerobatic, and Commuter Category Aeroplanes

(2) CS-25 Certification Specifications and Acceptable Means of Compliance for Large Aeroplanes

(3) CS-27 Certification Specifications and Acceptable Means of Compliance for Small Rotorcraft

(4) CS-29 Certification Specifications and Acceptable Means of Compliance for Large Rotorcraft

(5) CS-E Certification Specifications and Acceptable Means of Compliance for Engines and AMC 20-3B Certification of Engines Equipped with Electronic Engine Control Systems

(6) CS-P Certification Specifications for Propellers and AMC 20-1A Certification of Aircraft Propulsion Systems Equipped with Electronic Control Systems

(7) CS-ETSO Certification Specifications for European Technical Standard Orders

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 20-193

Related technical context

Engineering context
Evidence and scope

AC 20-193 and AMC 20-193 — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.