FAA internal procedures for issue papers and equivalent-level-of-safety memorandums; this is a process reference, not a collection of project-specific issue papers.

Aerospace Consulting reference note: Standardizes the documentation and resolution of certification issues and development of equivalent-level-of-safety findings, with formats and templates.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 6e48a5cba59de4c4847e9016749ae184817a43ad16627d24cdc7b90474851381

Source page 13 · PDF page 13

n. TCB or Project Team. The TCB is the FAA management team responsible for acquainting the applicant with the certification process, resolving significant problems, processing and coordinating IPs, and establishing a schedule for the overall accomplishment of the type certification project. A TCB is established only for significant projects. When a TCB is not necessary, the certification team manages the project and performs any TCB functions to the degree necessary.

3-2. Development of an IP.

a. For type certification projects, new IPs can be proposed to the TCB by the standards staff specialists, the PO, the PM, or by technical specialists for technical issues in their areas, through the PM. This can occur at any time during the process but before final type certification. For ODA projects, the OMT can propose new IPs (this also applies to the DSCO). (Refer to appendix A to this order for IP format and instructions in detail.) The PM must coordinate the “BACKGROUND” and “STATEMENT OF ISSUE” with the accountable directorate specialists through the PO. When a significant issue pertains to technical policy overseen by the Systems and Equipment Standards Branch (AIR-130), or a significant issue pertains to operational or maintenance suitability requirements overseen by the AEG offices, the PM must coordinate with those offices when formulating the “FAA POSITION” and “CONCLUSION.” For significant issues pertaining to policy overseen by the Certification Procedures Branch (AIR-110), the Operational Oversight Policy Branch (AIR-140), or the System Performance and Development Branch (AIR-150), the PM must coordinate with those offices when formulating the “FAA POSITION” and “CONCLUSION.”

(1) Draft IPs are developed by the project team members for each significant issue as early in the program as feasible. Ideally, IPs are proposed at the preliminary TCB meeting (TCBM) and the “STATEMENT OF ISSUE” section of the IP is developed. However, the major emphasis at stage 1 is to raise the issue to the FAA and applicant’s attention as early as feasible, providing concise “STATEMENT OF ISSUE” language that is clearly understood by all parties concerned with resolution. (Before releasing an IP at stage 1, document the “BACKGROUND” information.)

(2) Overall, the first priority is identifying, rather than resolving, significant issues. We do not expect all significant issues will be identified or resolved before the preliminary TCBM. Often, identification of IPs does not occur until the significant features of the type design are discovered later in the certification process. These IPs are generally issued at stage 2, which includes the “FAA POSITION” statement. IPs must be developed, revised, and concluded as a concerted effort between the FAA, a CA or VA (if applicable), and the applicant.

Note: There are certain cases where a stage 2 IP will include an “APPLICANT POSITION” statement before the “FAA POSITION” statement. These cases would include an applicant’s request for an ELOS where the FAA does not have a position until the applicant has made a request. This may also occur when an applicant proposes a new MoC that is outside of written FAA policy.

(3) If the applicant is aware of the need for an IP, we recommend including the “FAA POSITION” statement (initially released at stage 2) in the IP first introduced to the applicant. However, if controversial aspects and/or the nature of the issue require immediate and formal notification of the issue, release the IP at stage 1.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 21.101-1B

Related technical context

Engineering context
Evidence and scope

FAA Order 8110.112A and AC 21.101-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.