FAA FAA orderActive

FAA Order 8110.112A

Standardized Procedures for Usage of Issue Papers and Development of Equivalent Levels of Safety Memorandums

8110.112A Source checked 2026-11-28

Scope, source and reading notes

FAA internal procedures for issue papers and equivalent-level-of-safety memorandums; this is a process reference, not a collection of project-specific issue papers.

Aerospace Consulting reference note: Standardizes the documentation and resolution of certification issues and development of equivalent-level-of-safety findings, with formats and templates.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 6e48a5cba59de4c4847e9016749ae184817a43ad16627d24cdc7b90474851381

Source page 18 · PDF page 18

Chapter 4. Equivalent Level of Safety Memorandum Process

4-1. Process.

a. An IP is the vehicle for documenting the evolution and conclusion of the request for an ELOS finding. Applicants are responsible for making the request and submitting to the PACO the proposed ELOS with all necessary data required for the FAA to develop the IP and make the finding of equivalent safety.

b. The PACO then submits the IP to the accountable directorate. The IP includes the proposed ELOS in the “APPLICANT POSITION” and the proposed wording in the “FAA POSITION” in response to the applicant’s proposal.

c. The development and processing of the ELOS memorandum must occur concurrently with development of the “CONCLUSION.” The PACO sends the ELOS memorandum to the accountable directorate for approval and, because the IPs must be finalized (closed) before the issuance of a design approval, the ELOS memorandum must also be approved by the accountable directorate before the issuance of the design approval. The accountable directorate must inform the PACO of its evaluation and concurrence of the ELOS separately from the IP using the ELOS memorandum. The contents of the memorandum are kept as part of the permanent records of the project files and published on the FAA RGL.

Note: The ELOS memorandum process does not take the place of the IP process.

d. Address the ELOS memorandum from the accountable directorate to the certification office.

e. Either the originator of the IP or the PM constructs the ELOS memorandum on behalf of the accountable directorate, ensuring the memorandum contains the information called for in paragraphs 4-6a through f below.

Note: Refer to appendix C to this order for the standard ELOS memorandum template. Also, refer to the RGL ELOS section for actual ELOS memorandums.

f. The ELOS memorandum must contain—

(1) An introduction of the background information, including an explanation of the need for the ELOS;

(2) A listing of the applicable regulation(s);

(3) A description of the features of the design or other project elements that require the ELOS finding;

(4) A description of the compensating features (that is, any imposed design changes, limitations, or required equipment) that provide the ELOS;

(5) An explanation of how the actions taken provide an ELOS to that intended by the regulation; and

(6) The ACO recommendation to the accountable directorate for approving the ELOS.

Note: Because the content of this memorandum is kept as part of the permanent records of the project files, ensure the memorandum does not contain any sensitive or proprietary information.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 21.101-1B

Related technical context

Engineering context
Evidence and scope

FAA Order 8110.112A and AC 21.101-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.