FAA Order 8110.112A
Standardized Procedures for Usage of Issue Papers and Development of Equivalent Levels of Safety Memorandums
8110.112A Source checked 2026-11-28
Scope, source and reading notes
FAA internal procedures for issue papers and equivalent-level-of-safety memorandums; this is a process reference, not a collection of project-specific issue papers.
Aerospace Consulting reference note: Standardizes the documentation and resolution of certification issues and development of equivalent-level-of-safety findings, with formats and templates.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 6e48a5cba59de4c4847e9016749ae184817a43ad16627d24cdc7b90474851381
Chapter 3. Roles, Responsibilities, and the Issue Paper Process
3-1. Roles and Responsibilities.
a. Accountable Directorate. For any stage of the IP process released to the applicant, directorate team coordination and standard staff’s manager signoff is required. In the case of an ELOS finding, the accountable directorate approves the ELOS memorandum before the issuance of the design approval. The accountable directorate must inform the PACO of its evaluation and concurrence of the ELOS using the ELOS memorandum. In general, the primary purpose of the directorate review is to—
(1) Ensure and lead standardization of the IP by comparing it with similar IPs from other projects.
(2) Provide current policy related to the significant issue.
Note: With some validation projects, the accountable directorate may fulfill the role of the PACO in addition to the duties listed here.
b. ACO Manager. For type certification projects, the ACO manager is a member of the TCB. In the event of an impasse, the ACO manager may assist in the resolution after considering the views of all affected parties. Also, in the case of an ELOS finding, the ACO manager will sign the memorandum containing the ACO recommendation to the accountable directorate for approving an ELOS.
c. AEG. When a significant issue involves operations and/or maintenance aspects, coordinate the IP with the AEG when formulating the “FAA POSITION” and the “CONCLUSION.”
d. Certificate Management ACO (CMACO). Because this is the ACO managing a product’s TC and the continued airworthiness, the PACO must coordinate the IP with the CMACO for follow-on projects such as STCs or PMAs.
e. Chief Scientific and Technical Advisors (CSTA). The PM must include the appropriate CSTAs in the IP coordination process when significant technical issues arise regarding certification of state-of-the-art technology.
f. AIR-100. When a significant issue pertains to technical policy or procedural policy overseen by any of the AIR-100 branches, coordinate the IP with AIR-100 when formulating the “FAA POSITION” and “CONCLUSION.”
g. CAs and VAs. When the FAA is the VA, the FAA uses IPs to identify and resolve issues of particular interest to the FAA, including aspects of the design or proposed MoC that warrant further involvement (beyond familiarization) by the FAA. In certain cases, even when FAA and CA airworthiness standards and interpretations are identical, the FAA still needs to write our own IP. For example, the FAA writes IPs for ELOS (ESF) per 14 CFR 21.21(b)(1). Also, the FAA must write IPs on the certification basis (G-1), determination of compliance or compliance checklist (G-2), environmental considerations (G-3), and other unique import requirements (see FAA Order 8110.52, Type Validation and Post Type Validation Procedures, and the applicable bilateral agreements for more information). The FAA may choose to document an issue by means of a cover IP (CIP) if the bilateral partner authority has produced an equivalent document that is acceptable to the FAA to track resolution of an issue (see appendix E).
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
FAA Order 8110.112A and AC 21.101-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source