FAA FAA orderActive

FAA Order 8110.112A

Standardized Procedures for Usage of Issue Papers and Development of Equivalent Levels of Safety Memorandums

8110.112A Source checked 2026-11-28

Scope, source and reading notes

FAA internal procedures for issue papers and equivalent-level-of-safety memorandums; this is a process reference, not a collection of project-specific issue papers.

Aerospace Consulting reference note: Standardizes the documentation and resolution of certification issues and development of equivalent-level-of-safety findings, with formats and templates.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 6e48a5cba59de4c4847e9016749ae184817a43ad16627d24cdc7b90474851381

Source page 12 · PDF page 12

h. MIDO. When a significant issue pertains to manufacturing processes, production certification, or airworthiness certification, the PM must include the MIDO in the IP coordination.

i. PACO. The PACO is the ACO working the project. The PACO must coordinate the IP, as appropriate, with the accountable directorate, AIR-100, other AFS offices, and the CMACO (if a follow-on project such as an STC or PMA is applicable).

j. PM (Originator). The PM initiates or originates the IP and—

(1) Obtains concurrence from the ACO (that is, concurrence from all the branches involved and from the ACO manager).

(2) Transmits the IP to the accountable directorate through the PO.

(3) Obtains applicant position (and when necessary, discusses and clarifies the FAA position with the applicant).

(4) Obtains concurrence from the AEG, the MIDO, AIR-100, and CSTAs as needed.

(5) Obtains accountable directorate concurrence and approval of the IP.

(6) Develops the “CONCLUSION” and transmits it to the applicant.

(7) Places results in the official project file.

Note: Although the PM or project team member (technical specialist) originates or initiates IPs, the accountable directorate standard staff, the PM, the PO, or the OMT for ODA (this includes the DSCO) can determine what projects will require the use of IPs.

k. PO. The PO provides regulatory or policy input to the project team or TCB through the PM. The PO routes the IP through the accountable directorate’s specialists and manager to keep them apprised of the issue and to obtain their concurrence. The PO can also determine what certification projects will require the use of IPs and can propose them to the TCB. Quite often the PO acts as the PM for validation projects.

l. Technical Specialist. For type certification projects, the ACO’s technical specialists can, through the PM, propose new IPs to the TCB for technical issues in their areas at any time during the process before final type certification. When an IP is first presented to the TCB, the PM will identify each branch or technical specialist that might be involved in the resolution of the issue (by means of the FAA mail routing codes). TCB grid coordination need only include the involved branches specified in the “BRANCH ACTION” section, the accountable directorate, and the chairman.

m. Accountable Directorate’s Standard Staff. When a standard staff technical specialist identifies the potential need for an IP after the Certification Project Notification (CPN) Part B response has been sent to the ACO, it must be discussed with the branch manager. If the standard staff branch manager agrees with the need for an IP, the standard staff branch manager must contact the PM and corresponding manager at the PACO about the need.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 21.101-1B

Related technical context

Engineering context
Evidence and scope

FAA Order 8110.112A and AC 21.101-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.