FAA FAA orderActive

FAA Order 8110.112A

Standardized Procedures for Usage of Issue Papers and Development of Equivalent Levels of Safety Memorandums

8110.112A Source checked 2026-11-28

Scope, source and reading notes

FAA internal procedures for issue papers and equivalent-level-of-safety memorandums; this is a process reference, not a collection of project-specific issue papers.

Aerospace Consulting reference note: Standardizes the documentation and resolution of certification issues and development of equivalent-level-of-safety findings, with formats and templates.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 6e48a5cba59de4c4847e9016749ae184817a43ad16627d24cdc7b90474851381

Source page 14 · PDF page 14

(4) Project team members and other technical participants accomplish most of the type certification work through ongoing technical assessment activities outside the framework of formal TCBMs. Document progress on all items with normal entries in the official type certification project file. Indicate progress on significant issues by updating existing IPs or, if new significant issues are raised, by developing new IPs.

Note: IPs are considered “draft” until they are coordinated through the appropriate TCB members and the accountable directorate, their initials appear on the board coordination grid, and the accountable directorate has signed the IP.

(5) PMs must keep the accountable directorate, AIR-100, the MIDO, the AEG, and CSTAs fully apprised of the technical issues encountered throughout the evaluation process. POs must keep the specialists and managers at the accountable directorate apprised of the technical issues. The PM typically obtains accountable directorate assistance in formulating the “FAA POSITION” and “CONCLUSION” before the IP is submitted to the project team members for coordination. Directorate team coordination and standards staff manager sign-off on the IP is required at any stage of the IP that will be released to the applicant. The primary purpose of accountable directorate review is to—

(a) Ensure and lead standardization of the IP by comparing it with similar IPs from other projects.

(b) Provide current policy related to the significant issue.

(6) All new or revised IPs are coordinated with the applicant, the project team members, and the accountable directorate. If coordination with both the applicant and project team members happens without impasse, the IPs can be closed without holding a formal TCBM. In the event of an impasse, refer to the procedures in paragraph 5-2 of this order.

(7) Before completing the “CONCLUSION” of the IP, try to reach an agreement with the applicant on the IP’s final requirements. If further discussions require applicants to revise their position, revise the IP and the conclusion accordingly.

(8) The accountable directorate manager or their designee approves the “CONCLUSION” statement, and this approval constitutes the definition of the FAA requirement/position. The IP will be sent to the applicant directly or through the CA, if applicable. Further discussions, correspondence, or appeals must focus on new information or proposals. Responses to such efforts must refer to the current stage and date of the IP as well as indicate whether—

(a) The new effort provides new information warranting a reconsideration of, and revision to, the IP, or

(b) The IP “CONCLUSION” stands as written.

(9) Do not send draft copies of IPs to the applicant or to the VA or CA (if applicable) unless help is needed. For example, applicants are asked to confirm the technical correctness of the “BACKGROUND,” or asked to review their position as written in the IP to determine if it was conveyed properly. If sending a draft IP is unavoidable, ensure the accountable directorate has reviewed the contents of the draft, mark it as a draft, and ensure the applicant is aware that the IP is subject to change until final signature by the accountable directorate is obtained. Do not

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 21.101-1B

Related technical context

Engineering context
Evidence and scope

FAA Order 8110.112A and AC 21.101-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.