EASA Means of ComplianceFinal — current published edition checked

MOC-3 SC-VTOL

Means of Compliance with SC-VTOL — Batch 3

Issue 2 — FINAL Source checked 2026-11-28

Scope, source and reading notes

Complete final batch 3 of SC-VTOL means of compliance. Later batches may amend individual provisions in earlier batches.

Aerospace Consulting reference note: Third final batch, addressing propulsion battery thermal runaway and related safety considerations.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 8e7b1d83ad81cb96d502ea069c20636566899a735e683c7e0a4576aa98a4f0e6

Source page 10 · PDF page 10

Third Publication of Means of Compliance with the Special

Doc. No: MOC-3 SC-VTOL Issue: 2 Date: 21 June 2023

Condition VTOL

(A) To maximize the potential for propagation to other cells, the spacing and heat

transfer characteristics between cells should be assessed. (B) The battery system configuration, location of the cell within the battery system, and

point 7.(a)(3)(ii) should be assessed to justify the selection of cells with the potential to become worst cases to be tested (e.g. centre, wide face, narrow face, corner, edge…).

(vii) The tested battery system should be representative of the type design configuration,

and should include the installation into the aircraft, designated venting provision, installation orientation, and any other design configuration or variable that could impact the test outcome.

(viii) In case there are battery systems with different installations within the aircraft that

could impact the test outcome, these different installations should be tested, or if properly justified, at least the worst-case installation.

(ix) The tested battery system should not be modified to such an extent that the method of

propagation is not anymore representative of that for a non-modified battery system. Wires for heating, voltage, and temperature monitoring should be passed through the housing and any openings should be sealed to retain internal pressure. Suitable sealant may be high temperature RTV silicone rubber or equivalent.

(x) The cells should not be modified in any way that changes their composition or

mechanical properties (including the external cell case).

(xi) The temperature of the battery system before triggering the cell should be always

stabilized at 55°C or the maximum operating high temperature, whichever is higher.

(xii) The trigger mechanism may be deactivated once thermal runaway has been initiated in

the triggered cell.

(xiii) If a thermal runaway in the targeted cell does not occur, the objective of the test has

not been met.

(xiv) The following parameters should be recorded during the test:

(A) The voltage of at least the cell being triggered. (B) The temperature of the cell being triggered. (C) The temperatures of the cells nearest to the cell being triggered. (D) The temperature of the external surface of the battery system and/or Explosive Fire

Zone (including the venting provisions). (E) The volume at standard temperature and pressure, rate of release, and temperature

of gasses that exit the battery system and/or Explosive Fire Zone.

(xv) The battery system tested should be monitored for a minimum of 8 hours after the initial

thermal runaway event, and during this time it should comply with the following:

(A) No propagation to other cells. (B) No rupture of the battery system and/or Explosive Fire Zone. (C) No release of fragments outside the battery system and/or Explosive Fire Zone.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

SC-VTOL-02

Related technical context

Engineering context
Evidence and scope

SC-VTOL-02 and MOC-3 SC-VTOL — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.