FAA Advisory circularActive — selected source checked

AC 21.17-4

Type Certification—Powered-lift

21.17-4 · 2025-07-18 Source checked 2026-11-28

Scope, source and reading notes

Appendix A gives an acceptable means for certain powered-lift under §21.17(b). These criteria are not universally applicable CFR requirements; establish the basis for the particular aircraft.

Aerospace Consulting reference note: FAA guidance for the type certification of powered-lift, including the development of project airworthiness criteria.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: e1a60e5f5ed4f34764beb0866a0a1b65471832a1cf169ef670a6dd6bf434297e

Source page 1 · PDF page 1

U.S. Department of Transportation Federal Aviation Administration

Advisory Circular

07/18/2025

Subject: Type Certification—Powered-lift Date: AC No: 21.17-4 Initiated By: AIR-600

1 PURPOSE.

1.1 This advisory circular (AC) provides guidance for the type, production, and airworthiness certification of powered-lift. This AC also designates the airworthiness criteria in appendix A as an acceptable means, but not the only means, of showing compliance with title 14 of the Code of Federal Regulations (14 CFR) 21.17(b) for Federal Aviation Administration (FAA) type certification of certain powered-lift.

1.2 This is a guidance document. Its content is not legally binding in its own right and will not be relied upon by the Department as a separate basis for affirmative enforcement action or other administrative penalty. Conformity with the guidance document is voluntary only. Nonconformity will not affect rights and obligations under existing statutes and regulations.

2 RELATED MATERIAL.

2.1 Title 14, Code of Federal Regulations. The full text of these regulations is available at https://www.ecfr.gov.

• Part 1, Definitions and Abbreviations.

• Part 21, Certification Procedures for Products and Articles.

• Part 23, Airworthiness Standards: Normal Category Airplanes.

• Part 25, Airworthiness Standards: Transport Category Airplanes.

• Part 27, Airworthiness Standards: Normal Category Rotorcraft.

• Part 29, Airworthiness Standards: Transport Category Rotorcraft.

View figures, tables and original page layoutOriginal source page Source page 1 · PDF page 1 of AC 21.17-4

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

Joby JAS4-1 criteria

Related technical context

Engineering context
Evidence and scope

AC 21.17-4 and Joby JAS4-1 criteria — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source
Archer M001 criteria

Related technical context

Engineering context
Evidence and scope

AC 21.17-4 and Archer M001 criteria — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source
SC-VTOL-02

Related technical context

Engineering context
Evidence and scope

AC 21.17-4 and SC-VTOL-02 — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.