AC 20-152A
Development Assurance for Airborne Electronic Hardware
20-152A · 2022-10-07 Source checked 2026-11-28
Scope, source and reading notes
Electronic hardware for type certification or TSO authorisation; objective applicability depends on the hardware and DAL.
Aerospace Consulting reference note: Hardware development assurance, including custom devices, commercial off-the-shelf devices and use of DO-254/ED-80.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 06b17bec98562261063d87e518df3fe581412a5dce64b39ef4769c57433b6bc6
Objective CD-4 For hardware DAL A or DAL B, the applicant should review the detailed design with respect to the design standards and review the traceability between the detailed design and the custom device requirements, in order to demonstrate that the detailed design covers the custom device requirements, is consistent with the conceptual design, and is compliant with the hardware design standards.
For hardware DAL C, the applicant should demonstrate that the detailed design satisfies the hardware design standards.
5.5.2.3 Implementation Review
Within a custom device development process, tools are used to convert the detailed design data into the physical implementation. While ED-80/DO- 254 does not explicitly address it, a review of the design tool reports (e.g. synthesis and place and route reports) is necessary to ensure that the execution of the tool to generate its output was performed correctly.
Objective CD-5 When tools are used to convert the detailed design data into the physical implementation, the applicant should review the design tool reports (e.g. synthesis and place and route reports) to ensure that the tool executed properly when generating the output.
5.5.2.4 Review of Verification Cases and Procedures
ED-80/DO-254 introduces verification coverage analysis in Section 6.2.2, Item 4, to satisfy the ED-80/DO-254 verification process objectives and determine whether the verification process is correct and complete. A part of the coverage analysis is clarified by the following objective.
Objective CD-6 Each verification case and procedure should be reviewed to confirm that it is appropriate for the requirements to which it traces and that the requirements are correctly and completely covered by the verification cases and procedures.
5.5.2.5 Verification of the Timing Performance of the Implementation
ED-80/DO-254, Section 6.2 addresses the verification of the implementation. The implementation results from the process to generate the physical custom device from the detailed design data. The post-layout netlist is the closest virtual representation of the physical custom device, resulting from synthesis (for digital part of the device) and place and route.
While it is recommended to test the implementation in its intended operational environment (i.e. by a physical test), verification using the
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related EASA guidance
Engineering contextEvidence and scope
AMC 20-152A §8(b)(1); AC 20-152A §8.3
The AMC cites AC 20-152 without a suffix; the AC cites AMC 20-152(). Pairing these selected editions is editorial.
Comparable subject; no claim of blanket equivalence or automatic mutual acceptance.
Supporting sourceRecognises this edition
Source-backedEvidence and scope
AC 20-152A §1, printed p1
Names ED-80, April 2000.
AEH; conditions in AC sections 1 and 2.
Supporting sourceRecognises this edition
Source-backedEvidence and scope
AC 20-152A §1, printed p1
Names DO-254, 19 April 2000.
AEH; conditions in AC sections 1 and 2.
Supporting sourceLists related requirement
Source-backedEvidence and scope
AC 20-152A §8.1, printed p25
Explicitly lists 25.1309 for AEH development assurance.
The source cites the section identifier, without a certification-basis amendment.
Supporting sourceReferenced by system-safety guidance
Source-backedEvidence and scope
AC 25.1309-1B §5.3.4.2, printed p5-4 / PDF p30
Identifies AC 20-152A as hardware development-assurance guidance.
Read the source scope and applicable project basis.
Supporting sourceReferences this edition
Source-backedEvidence and scope
AC 20-152A §8.4, printed p26
Lists ARP4754A with an explicit date.
Related material; not a replacement for hardware-specific guidance.
Supporting sourceReferences this edition
Source-backedEvidence and scope
AC 20-152A §8.4, printed p26
Lists ARP4761 with an explicit date.
Related material; not a replacement for hardware-specific guidance.
Supporting source