FAA Advisory circularActive — selected source checked

AC 20-152A

Development Assurance for Airborne Electronic Hardware

20-152A · 2022-10-07 Source checked 2026-11-28

Scope, source and reading notes

Electronic hardware for type certification or TSO authorisation; objective applicability depends on the hardware and DAL.

Aerospace Consulting reference note: Hardware development assurance, including custom devices, commercial off-the-shelf devices and use of DO-254/ED-80.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 06b17bec98562261063d87e518df3fe581412a5dce64b39ef4769c57433b6bc6

Source page 16 · PDF page 16

5.11.3.3 Planning of the Hardware Development Assurance Approach related to COTS IP

5.11.3.3.1 Complementary Development Assurance

Objective IP-3 When the IP-2 objective criteria items 1, 2, 4, or 5 cannot be completely met using the IP provider’s data, the applicant should define an appropriate development assurance activity to mitigate the criteria that were not met and address the associated risk of development errors. The development assurance activity should be based on the ED-80/DO-254 objectives.

Note: The results of the assessment of objective IP-2, item 3 are considered in Section 5.11.3.3.2.

5.11.3.3.2 Verification Strategy for COTS IP Functions

In addition to the verification of the custom device functions supported by the COTS IP, there is a need to ensure that the aspects related to the COTS IP and its usage are addressed. This section focuses on defining a verification strategy to cover those aspects.

The verification performed by the COTS IP provider typically does not follow the ED-80/DO-254 verification process but may provide some credit to be used for the verification strategy. However, the verification process for COTS IP generally differs from one IP vendor to another, and the level of assurance varies depending on the IP provider’s development practices.

The verification strategy may combine different means to complement the traditional requirements-based testing approach.

Based on the applicant’s assessment of the IP provider and the IP data through objective IP-2, the applicant is expected to establish a verification strategy. The aim of this verification strategy is to cover all three of the following aspects:

• The COTS IP – the purpose is to ensure that the COTS IP is verified, addressing the risk identified from the IP-2, Item 3 objective;

• Its implementation – the purpose is to ensure that the COTS IP still performs its allocated function, and that no design errors have been introduced by the design steps performed by the applicant (e.g., synthesis/place and route);

• Its integration within the custom device – the purpose is to ensure that the COTS IP has been properly connected, configured, and constrained within the custom device.

View figures, tables and original page layoutOriginal source page Source page 16 · PDF page 16 of AC 20-152A

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AMC 20-152A

Related EASA guidance

Engineering context
Evidence and scope

AMC 20-152A §8(b)(1); AC 20-152A §8.3

The AMC cites AC 20-152 without a suffix; the AC cites AMC 20-152(). Pairing these selected editions is editorial.

Comparable subject; no claim of blanket equivalence or automatic mutual acceptance.

Supporting source
EUROCAE ED-80

Recognises this edition

Source-backed
Evidence and scope

AC 20-152A §1, printed p1

Names ED-80, April 2000.

AEH; conditions in AC sections 1 and 2.

Supporting source
RTCA DO-254

Recognises this edition

Source-backed
Evidence and scope

AC 20-152A §1, printed p1

Names DO-254, 19 April 2000.

AEH; conditions in AC sections 1 and 2.

Supporting source
14 CFR 25.1309

Lists related requirement

Source-backed
Evidence and scope

AC 20-152A §8.1, printed p25

Explicitly lists 25.1309 for AEH development assurance.

The source cites the section identifier, without a certification-basis amendment.

Supporting source
AC 25.1309-1B

Referenced by system-safety guidance

Source-backed
Evidence and scope

AC 25.1309-1B §5.3.4.2, printed p5-4 / PDF p30

Identifies AC 20-152A as hardware development-assurance guidance.

Read the source scope and applicable project basis.

Supporting source
ARP4754A

References this edition

Source-backed
Evidence and scope

AC 20-152A §8.4, printed p26

Lists ARP4754A with an explicit date.

Related material; not a replacement for hardware-specific guidance.

Supporting source
ARP4761

References this edition

Source-backed
Evidence and scope

AC 20-152A §8.4, printed p26

Lists ARP4761 with an explicit date.

Related material; not a replacement for hardware-specific guidance.

Supporting source

Copy reference

Select and copy the citation below.