FAA Order 8110.37G
Designated Engineering Representative (DER) Handbook
8110.37G Source checked 2026-11-28
Scope, source and reading notes
FAA procedures and limitations of authority for designated engineering representatives and the FAA staff who manage them; useful to relevant ODA engineering unit members.
Aerospace Consulting reference note: Current DER handbook describing compliance-finding responsibilities, procedures, technical guidance, and limitations of delegated authority.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 57c18cc6c30601537eed2f8e1fc3ff5cad71c5575956de38f0e2b969126e8e41
8110.37G
09/17/2026
b. Approval of Revised Data. When an MRB action results in a change to type design, a manufacturer must ensure approval of any data (both descriptive and substantiation data) required to show compliance with the change and any areas affected by the change (reference §§ 21.93, 21.95, 21.97, and 21.101). For additional guidance, refer to FAA Order 8110.4.
8. Approval of an AMOC to an AD.
a. Approval Process. A structural company DER with a special delegation to approve an AMOC must execute the AMOC approval on FAA Form 8110-3 (reference FAA Order 8110.103). The approval must at least specify:
(1) The affected aircraft model, serial number, and owner/operator. For a global AMOC, identify the applicable aircraft for which the AMOC is approved. This can be accomplished through a listing of applicable operators, serial numbers, or other limiting criteria, or if the global AMOC applies to all serial numbers, indicate explicitly.
(2) The AD number and paragraph(s) to which the AMOC applies.
(3) A complete and detailed description of the AMOC, including part names, numbers, and serial numbers (if applicable). A description of damage, alterations, repairs, and any inspections, inspection thresholds/intervals, and other necessary descriptive information.
(4) Any restrictions on the AMOC, such as special processes or time limitations.
(5) A statement as to whether or not the AMOC is transferable.
(6) Reference(s) to substantiating data.
(7) A reference to the DER’s letter of appointment from the FAA (and date) granting AMOC approval authority to that particular DER.
(8) A statement that the approval meets the applicable sections of the aircraft type certification basis or other defined airworthiness requirements. For example, an alternative inspection method requires an approved damage tolerance assessment. Specific 14 CFR paragraphs must be listed.
(9) The following statement: “Before using this AMOC, notify your appropriate principal inspector, or lacking a principal inspector, the manager of the local Flight Standards District Office/Certificate Holding District Office.”
(10) The following statement: “All provisions of AD ****-**-** that are not specifically referenced above remain fully applicable and must be complied with accordingly.”
(11) The following statement (not required for global AMOCs): “The [responsible office] will revoke this AMOC if the [responsible office] later determines that this AMOC does not provide an acceptable level of safety.”
Note: The responsible office is defined as the office identified in the AD as being authorized to approve AMOCs.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
FAA Order 8110.4C and FAA Order 8110.37G — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source