FAA FAA orderActive

FAA Order 8110.37G

Designated Engineering Representative (DER) Handbook

8110.37G Source checked 2026-11-28

Scope, source and reading notes

FAA procedures and limitations of authority for designated engineering representatives and the FAA staff who manage them; useful to relevant ODA engineering unit members.

Aerospace Consulting reference note: Current DER handbook describing compliance-finding responsibilities, procedures, technical guidance, and limitations of delegated authority.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 57c18cc6c30601537eed2f8e1fc3ff5cad71c5575956de38f0e2b969126e8e41

Source page 14 · PDF page 14

8110.37G

09/17/2026

alterations to a single aircraft, with the following exception: The same AMOC may be approved repeatedly on separate FAA Form 8110-3s for multiple aircraft that are determined eligible. In circumstances when the DER has documented a pattern of identical approvals and it has been demonstrated that the AMOC is applicable to a defined fleet of aircraft, the DER may be authorized to approve a global AMOC if coordinated with the responsible certification branch.

(a) An AMOC related to the following items may not be delegated:

• Adjustments to compliance times;

• Changes to operating limitations;

• Continued operation with unrepaired damage; and

• Discretionary judgments of acceptability.

(b) For an AMOC that involves a temporary repair, the temporary repair must:

• Meet the certification basis of the aircraft;

• Be designed so that the durability of the most critical detail of the temporary repair is greater than 18 months (based on projected aircraft use); and

• Be replaced by a permanent repair or terminating action within 24 months. Further, the FAA requires the temporary repair to be designed so its inspection threshold is greater than its replacement period. In other words, there must not be a need to inspect the temporary repair while it remains installed.

(c) An authorized DER may approve an alternate inspection method, threshold, or interval where a new repair or alteration results in the inability to accomplish the existing AD- mandated inspection or necessitates a change in the existing AD inspection threshold. The standard for these approvals is the appropriate damage tolerance regulation (e.g., § 25.571, amendment 45 or later).

Note: More information on FAA oversight and delegation can be found in FAA Order 8110.4.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

FAA Order 8110.4C

Related technical context

Engineering context
Evidence and scope

FAA Order 8110.4C and FAA Order 8110.37G — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.