FAA FAA orderActive

FAA Order 8110.112A

Standardized Procedures for Usage of Issue Papers and Development of Equivalent Levels of Safety Memorandums

8110.112A Source checked 2026-11-28

Scope, source and reading notes

FAA internal procedures for issue papers and equivalent-level-of-safety memorandums; this is a process reference, not a collection of project-specific issue papers.

Aerospace Consulting reference note: Standardizes the documentation and resolution of certification issues and development of equivalent-level-of-safety findings, with formats and templates.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 6e48a5cba59de4c4847e9016749ae184817a43ad16627d24cdc7b90474851381

Source page 16 · PDF page 16

Figure 1. Issue Paper Process Flowchart

THE ISSUE PAPER PROCESS This Process Applies to Type Certification, Type Validation, PMA, TSOA, and 14 CFR 21.8(d) Projects.

Entry Point

A

Originator

The project manager, ACO specialists, accountable directorate standard staff, FAA Coordination, Approval and OMT(including DSCO), or Transmittal Sub-Process. the project officer can make decision to generate issue paper for significant technical, regulatory, or administrative issue

Program/Project Manager (PM)

------ ------ r---- I I I I I I I I I I I I I

Enter general info., statement of issue, and background (Stage 1)

Obtain concurrence from the ACO, transmit issue paper to project officer

A

Program/Project Manager (PM)

Originator

Enter FAA position (Stage 2)

Obtain concurrence, as needed, from AEG, MIDO, AIR-100 and CSTAs.

A

Project Officer (PO)

Project Officer (PO)

Originator or PM

Originator or PM

Coordinate revisions with the PM.

Provide regulatory/policy input and route the issue paper through the accountable directorate’s specialists and managers

Coordinate with applicant and obtain applicant position. (Stage 3)

Discuss and clarify FAA position with applicant and foreign CA (if applicable). Also update issue paper with new positions as necessary.

Yes

A

Need issue paper revision?

No

No

Agreement reached?

Project Officer (PO)

Yes

PM

Obtain directorate approval and transmit approved issue paper to PM who transmits the issue paper to the applicant

Originator or PM

Transmit to applicant and foreign CAA (if applicable)

Return to process

Develop Conclusion (Stage 4)

- - ~~=- - - - - - - - -

PM

A

Note: The FAA coordination, approval and transmittal sub-process is mandatory prior to sending an issue paper to an applicant.

Place results (background, issue, conclusion) in official project file.

END

View figures, tables and original page layoutOriginal source page Source page 16 · PDF page 16 of FAA Order 8110.112A

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 21.101-1B

Related technical context

Engineering context
Evidence and scope

FAA Order 8110.112A and AC 21.101-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.