FAA Advisory circularActive

AC 20-189

Management of Open Problem Reports (OPRs)

20-189 Source checked 2026-11-28

Scope, source and reading notes

Management of open problem reports in the system, software, and airborne electronic hardware domains for type certification and TSO authorization.

Aerospace Consulting reference note: Provides a framework for assessing and managing unresolved problem reports and communicating their effects on certification findings.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 30042e1dfff49db2953e6683874baafdb912a9096900f3f62f3bb98ab3ba0b73

Source page 4 · PDF page 4

6.1 Classification of OPRs

6.1.1 The applicant should establish an OPR classification scheme including, at a minimum, the following classifications: ‘Significant’, ‘Functional’, ‘Process’, and ‘Life Cycle Data’. Other classifications or sub-classifications may be created as needed. The classification scheme should be described in the appropriate planning document(s).

6.1.2 Each OPR should be assigned a single classification per the classification scheme. When multiple classifications apply, the OPR should be assigned the classification with the highest priority. The priority from highest to lowest (including defined sub-classifications) is:

• ‘Significant’;

• ‘Functional’;

• ‘Process’;

• ‘Life Cycle Data’;

• Any other OPR classification.

Note: the classification of an individual OPR may differ from one stakeholder to another, depending on the known mitigations at the time of classification.

6.1.3 The classification of an OPR should account for and document all mitigations known at the time of classification that are under the control of the classifying stakeholder. A mitigation that is controlled by another stakeholder may be considered in the classification only if validated with that stakeholder, and provided this mitigation remains acceptable in the frame of the type certificate (TC)/supplemental type certificate (STC) approval, or TSO article authorization, as applicable.

6.1.4 A stakeholder, other than the aircraft TC or STC applicant, should classify as ‘Significant’ any OPR for which the classification may vary between ‘Functional’ and ‘Significant’, depending on the installation.

6.2 Assessment of OPRs. Each OPR should be assessed to determine:

• Any resulting functional limitations or operational restrictions at the equipment level (for TSO articles) or at the product level (for other types of approvals);

• Relationships that may exist with other OPRs; and

• For a ‘Significant’ or ‘Functional’ OPR, the underlying technical cause of the problem.

6.3 Disposition: OPRs classified as ‘Significant’ per the classification in paragraph 6.1, for which no sufficient mitigation or justification exists to substantiate the acceptability of

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AMC 20-189

Related technical context

Engineering context
Evidence and scope

AC 20-189 and AMC 20-189 — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.