AC 20-189
Management of Open Problem Reports (OPRs)
20-189 Source checked 2026-11-28
Scope, source and reading notes
Management of open problem reports in the system, software, and airborne electronic hardware domains for type certification and TSO authorization.
Aerospace Consulting reference note: Provides a framework for assessing and managing unresolved problem reports and communicating their effects on certification findings.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 30042e1dfff49db2953e6683874baafdb912a9096900f3f62f3bb98ab3ba0b73
6.5 TSOA Specifics: The TSO Authorization holder may exclude from the reporting process (per paragraph 6.4) any OPRs classified as ‘Process’ or ‘Life Cycle Data’ that are not necessary for the installation approval. However, all OPRs should be available upon request by the certification authority for assessment in the frame of the TSO approval.
7. STAKEHOLDER RESPONSIBILITIES. The levels of stakeholders include: item, equipment or TSO article, system, and product. The actual stakeholders for a specific project depend on the project organization.
7.1 PR Management (per paragraph 5): Should be performed by the stakeholder at each level. The applicant has responsibility for the overall PR process for all the involved stakeholders.
7.2 OPR Management (per paragraph 6): Should be performed, at a minimum, at the TSO article level, at the level of each individual system within a product, and at the product level.
8. RELATED PUBLICATIONS.
8.1 Title 14 CFR Applicable Sections. This AC provides guidance on development of an acceptable means of compliance to the following regulations, with respect to managing problem reporting: 14 CFR parts 21, 23, 25, 27, 29, 33, and 35 (principally, §§ 21 subpart O, 23.2500, 23.2505, 23.2510, 25/27/29.1301, 25/27/29.1309, 33.28, and 35.23).
8.2 FAA ACs (Refer to current version)
• AC 20-115, Airborne Software Development Assurance Using EUROCAE ED-12( ) and RTCA DO-178( ).
• AC 20-152, Development Assurance for Airborne Electronic Hardware (AEH).
• AC 20-170, Integrated Modular Avionics Development, Verification, Integration and Approval using RTCA DO-297 and Technical Standard Order C-153.
• AC 20-171, Alternatives to RTCA/DO-178B for Software in Airborne Systems and Equipment.
• AC 20-174, Development of Civil Aircraft and Systems.
• AC 21-46, Technical Standard Order Program.
• AC 21-50, Installation of TSOA Articles and LODA Appliances.
• AC 23.2010-1, FAA Accepted Means of Compliance process for 14 CFR Part 23.
• AC 23.1309-1, System Safety Analysis and Assessment for Part 23 Airplanes.
• AC 25.1309-1, System Design and Analysis.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 20-189 and AMC 20-189 — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source